Komori
Printnet (7805) · RiskReframed

Disaster Risk at Head Office and Production Facilities

First written in FY2018. 2 of 5 entries say "Restated". Latest entry: FY2024.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018 – FY2019ReframedFY2020RestatedFY20212019: 120192020: 120202021: 220212022: 020222023: 020232024: 12024
Same theme, other companies

Printnet moved to the "Worse" side of this theme in 2024, 3 years after the typical company in this theme (2021).

The whole theme swung hardest in 2020: 21 of 74 companies on the "Worse" side.

5 other companies' latest entry also says "Reframed".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 100 companies compared. The sentences above are computed from all 100.
Full recordFilings, disclosures and news, newest first
  1. FY2024ReframedAnnual report

    「The Company's headquarters are located in Kagoshima Prefecture, and its principal production sites are located in Yamanashi Prefecture and Kagoshima Prefecture.」

    Reflecting the location following the relocation of its headquarters, the Company discloses disaster risk on the basis that its headquarters are in Kagoshima Prefecture and its production sites are in Yamanashi Prefecture and Kagoshima Prefecture.
  2. FY2021RestatedAnnual report

    「The Company's headquarters are located in Tokyo, and its principal production sites are located in Yamanashi Prefecture and Kagoshima Prefecture.」

    The Company continues to disclose disaster risk and the locations of its headquarters and principal production sites.
  3. FY2020ReframedAnnual report

    「The Company's headquarters and principal production sites are located in Tokyo, Yamanashi Prefecture and Kagoshima Prefecture.」

    Following the closure of the Kansai Plant and Tokyo Digital Center, the Company discloses Tokyo, Yamanashi Prefecture and Kagoshima Prefecture as the locations of its headquarters and principal production sites.
  4. FY2019RestatedAnnual report

    「The Company's headquarters and principal production sites are located in Tokyo, Yamanashi Prefecture, Osaka Prefecture and Kagoshima Prefecture.」

    The Company reflects the location of its sites following the opening of the Kansai Plant and continues to disclose disaster risk at its headquarters and production sites.
  5. FY2018First statedAnnual report

    「If our headquarters or production sites are damaged by a major disaster in the same region, such as a major earthquake, tsunami, storm or flood caused by climate change, or if an unforeseen event exceeding expectations causes extensive damage to social infrastructure, reduces its functionality or halts production, our results could be materially affected.」

    The headquarters and principal production sites are located in Tokyo, Yamanashi and Kagoshima prefectures.
Moved together

"Strengthening Purchasing Power for Printing Materials and Lowering the Materials Cost Ratio" moved the same way as this thread, in the same document, in 2 of its 5 moves.

222★123
  1. ★This thread
  2. 1Strengthening Purchasing Power for Printing Materials and Lowering the Materials Cost Ratio2×
  3. 2Fluctuations in the Prices of Paper and Other Materials2×
  4. 3Higher Revenue and Profits and Improved Profitability2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Printnet's next results are scheduled for 2026-10-14. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.