Seiwa Chuo Holdings (7531) · RiskWorsened
Risk of Steel Processing Delays Due to Bolt Shortages
First written in FY2019-Q1. 1 of 4 entries say "Restated". Latest entry: FY2019.
4entries
2years
0from disclosures
How it moved
Same theme, other companies
Decline in construction demand due to building-material supply constraints and soaring pricesA theme 20 companies write about · 20 as a headwind · 0 as a tailwind
Seiwa Chuo Holdings moved to the "Worse" side of this theme in 2020, 2 years before the typical company in this theme (2022).
The whole theme swung hardest in 2025: 9 of 12 companies on the "Worse" side.
5 other companies' latest entry also says "Worsened".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 20 companies compared. The sentences above are computed from all 20.Full recordFilings, disclosures and news, newest first
- FY2019WorsenedAnnual report
「また建設向けも慢性的な人手・加工能力不足に加え、ボルト不足問題も抱え、着工延期が発生する等、前年を下回る状況が続きました。」
第3四半期にボルト不足問題の改善が記載された後も、通期ではボルト不足問題を抱え、着工延期が発生したと記載されている。建設向け需要の低調さが続いている。 - FY2019-Q3MitigatedAnnual report
「建設向け需要もボルト不足問題の改善がありましたが着工延期等もあり」
ボルト不足問題については改善があったと明示され、従来の継続的な不足状況からリスクは一部低減している。一方、着工延期等による需要低調は残っている。 - FY2019-Q2RestatedAnnual report
「鉄骨加工に関する人手・能力不足問題やボルト不足があり」
鉄骨加工に関するボルト不足が引き続き発生し、建設向け需要がやや低調となる要因として再確認されている。 - FY2019-Q1First statedAnnual report
「鉄骨加工に関わる人手・能力不足問題やボルト不足が引き続き発生するなど」
鉄骨加工に関わるボルト不足が引き続き発生していると記載され、鉄鋼内需がやや低調となる要因の一つとして示されている。