Theft of Electrical Cables and Other Damage at a Solar Power Generation Facility
SANRIN CO.,LTD. (the filing company)
SANRIN Matsumoto Power Plant (Matsumoto, Nagano Prefecture; panel output: 1.923 MW)
Theft of electrical cables and other factors
Company response
Power generation at the SANRIN Matsumoto Power Plant
Specific resumption date Not disclosed (restoration of power generation is planned)
A police on-site investigation was conducted. A third-party committee, special investigative committee or similar body is Not disclosed.
Related procedures
Police on-site investigation and submission of a damage report
Police (name Not disclosed)
The Company believes that the impact of the suspension of power generation on its consolidated earnings forecast for the fiscal year ending March 2027 will be limited, and there is no change to the forecast.
Restoration work will be carried out promptly, with restoration of power generation planned. The Company will issue a further notice if there is any material change in the situation.
| Item | Details |
|---|---|
| Event name | Theft of Electrical Cables and Other Damage at a Solar Power Generation Facility |
| Date of occurrence | Early hours of 28 May 2026 |
| Date recognized / date notice received | 28 May 2026 (the alarm system was confirmed to have been activated, and the damage was confirmed during an on-site inspection that same day) |
| Subject Entity | SANRIN CO.,LTD. (the filing company) |
| Target Locations / Products | SANRIN Matsumoto Power Plant (Matsumoto, Nagano Prefecture; panel output: 1.923 MW) |
| Cause | Theft of electrical cables and other factors |
| Impact on Earnings Forecast | The Company believes that the impact of the suspension of power generation on its consolidated earnings forecast for the fiscal year ending March 2027 will be limited, and there is no change to the forecast. |
| Type of litigation or proceeding | Police on-site investigation and submission of a damage report |
| Court or authority | Police (name Not disclosed) |
| Suspended operations | Power generation at the SANRIN Matsumoto Power Plant |
| Scheduled resumption date | Specific resumption date Not disclosed (restoration of power generation is planned) |
| Investigation structure | A police on-site investigation was conducted. A third-party committee, special investigative committee or similar body is Not disclosed. |
| Outlook | Restoration work will be carried out promptly, with restoration of power generation planned. The Company will issue a further notice if there is any material change in the situation. |
| Planned follow-up disclosure | The Company will issue a further notice if there is any material change in the situation. |
Items this document does not state (11)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.Power generation was suspended due to the theft of electrical cables and other factors.