Komori
AeroEdge (7409) · RiskMitigated

Failure and delay in mass production of the new titanium-aluminum blade material

First written in FY2025. 2 of 5 entries say "Restated". Latest entry: FY2026.

5entries
2years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2025 – 2026-09-072025: 120252026: 42026
Same theme, other companies
Profitability deterioration due to higher new product prototyping costs and deteriorating yieldsA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

2 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「As a result, we confirmed that the final quality of the new material processed on the current production line was satisfactory and proceeded with various final checks toward obtaining certification for mass production.」

    In response to the risk of failure or delays in bringing the new material into mass production, development progressed through completion of the laboratory building, SAFRAN’s testing and evaluation accreditation and final quality confirmation. However, mass-production certification and full-scale mass production have not yet been completed.
  2. FY2025First statedAnnual report

    「We have spent several years developing new titanium-aluminide blade materials to avoid material supply risk and expand earnings. As mass production became feasible, we plan to begin gradually supplying our own new materials from the fiscal year ending June 2027 and ultimately switch all titanium-aluminide blades processed by us to our own new materials. However, mass production of new materials through casting is a first for us. If mass production failed or the schedule were delayed, our results and financial condition could be materially affected through lower sales and profits for titanium-aluminide blades and weaker cash management caused by lower collection of sales proceeds.」

    Mass production of the new material is intended to reduce supply risk and expand earnings, but because casting-based mass production is new to the company, failure or delays were identified as a new risk to results and cash management.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for AeroEdge yet. It last moved in the Business Plan of 2026-09-07: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Failure and delay in mass production of the new titanium-aluminum blade material | AeroEdge Co.,Ltd (7409) | Komori