Construction of YOROZU's New Aichi Plant and Production Consolidation
First written in FY2022-Q3. 5 of 7 entries say "Advanced", first in FY2022. Latest entry: 2026-08-07.
No other company in this theme has enough history to compare yet.
- 2026-08-07AdvancedEarnings
「Operating income increased ¥228 million year on year to ¥106 million, due to higher revenue, improvements from rationalization and the effects of full-scale production at the Sustainable Manufacturing Center (YSMC), among other factors.」
YSMC progressed from the preparation stage for full-scale production to the stage at which the benefits of full-scale production contributed to operating income in the Japan segment. - FY2026-H1AdvancedAnnual report
「Operating profit was ¥255 million, down 59.1% year on year, partly due to the recognition of preparation costs for ramping up YSMC to full production.」
Following completion and the start of operations, YSMC advanced to the preparation stage for full production, and the associated preparation costs affected operating profit in the Japan segment. - FY2025-H1AdvancedAnnual report
「1. Japan: Sales were ¥28,085 million, down 5.2% from the same accounting period of the previous year, due mainly to the decline in production volumes. Operating profit was ¥624 million, down 76.3%, despite the inclusion of cost reductions, due to lower mould sales and initial costs associated with the start of operations at the YOROZU Sustainable Manufacturing Center (YSMC) head plant.」
The start of operations at the YSMC head plant was reflected in the results, and initial costs became a factor behind the decline in operating profit in the Japan segment. - FY2024AchievedAnnual report
「March 2024: A new plant was completed in Wanouchi, Gifu Prefecture, with the goal of fully decarbonising the production process.」
Construction of YSMC, the new site in the Tokai region, was completed. In April 2024, its corporate name was changed from ヨロズ愛知 to YSMC, and its head office was relocated to Wanouchi. - FY2023AdvancedAnnual report
「Preparations are under way for the new site in the Tokai region, where construction began in November 2022 and operations are targeted to begin during fiscal 2023. All electricity used at the site will be supplied by green power, including solar power generation installed on site, and the Company will achieve zero CO2 emissions, including from the heat source for the painting boiler.」
Construction of the new site in the Tokai region began in November 2022, and the project advanced to the stage of preparing for the start of operations during fiscal 2023. The Company aims to achieve zero CO2 emissions through green power and measures addressing heat sources. - FY2022AdvancedAnnual report
「The Company decided to construct a new plant in the Tokai region, with construction scheduled to begin in November 2022 and completion scheduled for January 2024. The new plant will obtain all of its electricity from green power, including solar power generation installed on site, with the aim of achieving zero CO2 emissions in the production process and expanding its range of lightweight products.」
For the new plant in the Tokai region, construction was scheduled to begin in November 2022 and completion in January 2024. The Company specified its plans to achieve zero CO2 emissions in the production process using green power and to expand its range of lightweight products. - FY2022-Q3First statedAnnual report
「At a meeting of the Board of Directors held on 9 February 2022, the Company decided to construct a new plant for its consolidated subsidiary in the Tokai region, ヨロズ愛知 (Nagoya, Aichi), and consolidate and relocate the subsidiary's production to the new plant. The planned site for the new plant is in Wanouchi, Anpachi District, Gifu Prefecture. The Company will proceed with various arrangements with the Wanouchi Town Land Development Public Corporation and Wanouchi Town, the potential site.」
To strengthen its production base in the Tokai region, the Company decided to consolidate and relocate ヨロズ愛知's production to a new plant planned for Wanouchi, Anpachi District, Gifu Prefecture. Construction was scheduled to begin in November 2022 and be completed in January 2024. The site area is approximately 79,700 square metres, the total floor area is approximately 18,400 square metres, and total investment is approximately ¥12 billion.