Komori
Daido Metal (7245) · RiskAdvanced

Risk of Operational Shutdowns Due to Large-Scale Earthquakes and Natural Disasters

First written in FY2016. 4 of 6 entries say "Advanced", first in FY2020. Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY20262016: 120162017: 120172018: 020182019: 020192020: 120202021: 120212022: 020222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 501 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「The Group's countermeasures include formulating a business continuity plan (BCP) based on the assumption that a major earthquake or similar event could occur, conducting disaster drills, and strengthening systems for the continuation and recovery of operations. In addition, the Company has introduced an employee safety confirmation system and established a system to ascertain employees' situations in the event of an emergency.」

    In addition to the existing BCP, disaster drills and insurance coverage, an employee safety confirmation system was introduced.
  2. FY2024AdvancedAnnual report

    「All domestic production plants are covered by fire and wind-and-flood insurance. In addition, the main production sites in Inuyama, Aichi Prefecture; Seki, Gifu Prefecture; Gujo, Gifu Prefecture; Narashino, Chiba Prefecture; Kōzaki, Katori District, Chiba Prefecture; Yaita, Tochigi Prefecture; Minamiaizu, Minamiaizu District, Fukushima Prefecture; and Takeo, Saga Prefecture, are covered by earthquake insurance up to the insured limits.」

    Regarding natural disaster response, the main production sites covered by earthquake insurance have been specified as sites in 8 regions, compared with the previous 5 plants.
  3. FY2021AdvancedAnnual report

    「All domestic production plants are covered by fire and wind-and-flood insurance. In addition, the main production plants in Inuyama, Aichi Prefecture; Seki, Gifu Prefecture; Gujo, Gifu Prefecture; Yaita, Tochigi Prefecture; and Takeo, Saga Prefecture, are covered by earthquake insurance up to the insured limits.」

    The document specifies the insurance coverage for natural disasters: fire and wind-and-flood insurance for all domestic production plants and earthquake insurance for the 5 main plants.
  4. FY2020AdvancedAnnual report

    「The Group's countermeasures include formulating a business continuity plan (BCP) based on the assumption that a major earthquake or similar event could occur, conducting disaster drills, and strengthening systems for the continuation and recovery of operations. In addition to fire and wind-and-flood insurance, the main plants in Inuyama, Aichi Prefecture; Seki, Gifu Prefecture; Gujo, Gifu Prefecture; and Takeo, Saga Prefecture, are covered by earthquake insurance up to the insured limits.」

    The document expressly states that disaster drills are conducted under the BCP and identifies 4 main plants covered by earthquake insurance.
  5. FY2017MitigatedAnnual report

    「The Group has formulated a business continuity plan (BCP) based on the assumption that a major earthquake or similar event could occur, and is further strengthening systems for the continuation and recovery of critical operations. The main plants in Inuyama, Aichi Prefecture, and Seki, Gifu Prefecture, are covered by earthquake insurance up to the insured limits.」

    The formulation of a BCP, strengthening of response systems, and earthquake insurance for the main plants are described as measures against natural disaster risks.
  6. FY2016First statedAnnual report

    「A major earthquake could disrupt the Group's production activities and affect its business results and financial position.」

    Risks of earthquakes, floods and supply shortages based on the locations of the main domestic plants. Business continuity planning, maintenance and renovations are listed as countermeasures.
Moved together

"Establishment and Operation of a Group Internal Control System" moved the same way as this thread, in the same document, in 5 of its 6 moves.

544444★123456
  1. ★This thread
  2. 1Establishment and Operation of a Group Internal Control System5×
  3. 2Building a Strong Financial Base4×
  4. 3Expansion of Global Production Capacity4×
  5. 4Strengthening the sales structure, technical support and regional responsiveness4×
  6. 5Strengthening Bearing Performance Analysis, New Product Development and Basic Research4×
  7. 6Establishment of DM Casting Technology (Thailand) and preparations to commence production4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Daido Metal yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Operational Shutdowns Due to Large-Scale Earthquakes and Natural Disasters | DAIDO METAL CO.,LTD. (7245) | Komori