Building a stable materials procurement system

First written in FY2019. 11 of 15 entries say "Advanced", first in FY2020. Latest entry: FY2026.

15entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2019AdvancedFY2021 – FY2022AdvancedFY2023-Q3 – FY20262019: 120192020: 220202021: 320212022: 420222023: 120232024: 120242025: 220252026: 12026
Same theme, other companies
Stable Timber Procurement through “Tama Structure”A theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「During the fiscal year, preparations progressed for 株式会社山西 and 株式会社テクセル to begin operations as new structural-processing plants, bringing the number of designated structural-processing plants to 14 nationwide from April 2026.」

    The number of designated structural-processing plants is set to increase from 13 in the previous fiscal year to 14 nationwide from April 2026. Preparations for 山西 and テクセル to begin operations have progressed.
  2. FY2026-H1AdvancedAnnual report

    「Outsourced structural-processing (precut-processing) agreement Counterparty Agreement Date executed Agreement details Term ㈱山西 Basic Agreement for Precut Transactions 1 September 2025 Agreement concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products 1 September 2025 to 31 August 2030 Automatically renewed annually thereafter」

    The company entered into an agreement with ㈱山西 concerning the supply and outsourced processing of precut materials and the purchase of finished products, adding supply capacity through August 2030.
  3. FY2025AdvancedAnnual report

    「During the fiscal year, preparations progressed for the Mitsuke Plant of 株式会社タツミ to begin operations as a new structural-processing plant, bringing the number of designated structural-processing plants to 13 nationwide from April 2025.」

    The number of designated structural-processing plants is expected to increase from 12 at the end of the previous fiscal year to 13 nationwide from April 2025. Preparations for the Mitsuke Plant of 株式会社タツミ to begin operations have progressed.
  4. FY2024AdvancedAnnual report

    「During the consolidated fiscal year, the company entered into an outsourced structural-processing agreement with its subsidiary 翠豊 in September 2023 and commenced operations. As of the end of the consolidated fiscal year, there were 12 designated structural-processing plants nationwide.」

    The company entered into an outsourced structural-processing agreement with 翠豊 and commenced operations, bringing the number of designated structural-processing plants to 12 nationwide. The expansion of supply capacity became concrete.
  5. FY2023-Q3AdvancedAnnual report

    「Outsourced structural-processing (precut-processing) agreement Counterparty Agreement Date executed Agreement details Term ティンバラム㈱ Basic Agreement for Precut Transactions 1 December 2022 Agreement concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products 1 December 2022 to 30 November 2027 Automatically renewed annually thereafter」

    The company entered into an agreement with ティンバラム㈱ concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products, adding supply capacity through November 2027.
  6. FY2023-Q2RestatedAnnual report

    「Against this backdrop, our group leveraged its proprietary supply chain to reliably procure timber in line with projected SE Structural System shipments and provide a stable supply.」

    The company continued to describe the reliable procurement and stable supply of timber through its proprietary supply chain despite raw-material inflation and import restrictions.
  7. FY2023-Q1RestatedAnnual report

    「Against this backdrop, our group leveraged its proprietary supply chain to reliably procure timber in line with projected SE Structural System shipments and provide a stable supply.」

    The company continued to describe securing and stably supplying timber through its proprietary supply chain despite soaring timber prices and procurement uncertainty. No new specific milestone was presented.
  8. FY2022AdvancedAnnual report

    「During the fiscal year, the Hamamatsu Plant began operations in March 2022, bringing the number of outsourced structural-processing plants to 10 nationwide.」

    The Hamamatsu Plant began operations in March 2022, bringing the structural-processing supply system to 10 plants nationwide.
  9. FY2022-Q3AdvancedAnnual report

    「Against this backdrop, our group leveraged its long-established supply chain to secure timber in line with projected SE Structural System shipments and provide a stable supply. We also adjusted selling prices in a timely manner, securing a certain profit margin.」

    The company stated that it secured a certain profit margin by securing timber and maintaining a stable supply in line with projected shipments, while adjusting selling prices in a timely manner.
  10. FY2022-Q2AdvancedAnnual report

    「Outsourced structural-processing (precut-processing) agreement Counterparty Agreement Date executed Agreement details Term ハイビック㈱ Basic Agreement for Precut Transactions 1 August 2021 Agreement concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products 1 August 2021 to 31 July 2026 Automatically renewed annually thereafter」

    The company entered into an agreement with ハイビック㈱ concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products, adding supply capacity through July 2026.
  11. FY2022-Q1AdvancedAnnual report

    「Against this backdrop, our group leveraged its supply-chain strengths to secure timber in line with projected SE Structural System shipments and provide a stable supply while limiting price increases.」

    In response to soaring prices and supply uncertainty caused by the wood shock, the company secured timber in line with projected SE Structural System shipments and maintained a stable supply.
  12. FY2021AdvancedAnnual report

    「Our group will work to ensure a stable supply of materials to registered builders through integrated supply chain management spanning structural design, materials procurement, and construction. Specific initiatives include strengthening the supply chain through system integration with structural-processing plants and an ordering system linked to structural calculations, while promoting the use of domestic timber. Domestic timber currently accounts for approximately 30% of the materials used, but technical approval for the use of cedar and other domestic timber in the SE Structural System was obtained in September 2020, and preparations to increase the domestic-timber ratio are complete. Going forward, we will implement measures to further increase the use of domestic timber.」

    As measures to address the wood shock, the company cited system integration with plants, an ordering system linked to structural calculations, and the use of domestic timber. Technical approval for cedar and other materials was obtained in September 2020.
  13. FY2021-Q2Termination of precut-processing agreementAnnual report

    「The agreements terminated during the second quarter of the consolidated fiscal year were as follows. Precut-processing agreement Counterparty: New Constructor's Network Co.,Ltd. (the Company), 株式会社カナモク Agreement: Basic Agreement for Precut Transactions Date executed: 1 April 1998 Agreement details: Agreement concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products Term: 1 April 1998 to 31 March 1999 Automatically renewed annually thereafter」

    The company disclosed the termination of its agreement with 株式会社カナモク concerning the supply and outsourced processing of precut materials using the SE Structural System and the purchase of finished products. No explanation was provided regarding the impact of the termination on the supply system.
  14. FY2020AdvancedAnnual report

    「Our group outsources the processing of glulam and other materials to 10 structural-processing plants nationwide. To accommodate future expansion in the housing and non-housing sectors, we will strengthen our supply system by adding structural-processing plants and considering in-house structural processing through M&A.」

    The group has established a system of 10 structural-processing plants nationwide and is also considering adding plants and bringing processing in-house through M&A.
  15. FY2019First statedAnnual report

    「We will build a more stable materials procurement system, including by securing procurement routes from multiple building-materials wholesalers.」

    Given the difficulty of securing timber resources and intensifying competition in the building-materials market, the policy is to diversify procurement sources.
Moved together

"Nationwide expansion of the registered builder network" moved the same way as this thread, in the same document, in 10 of its 15 moves.

101010865★123456
  1. ★This thread
  2. 1Nationwide expansion of the registered builder network10×
  3. 2Expansion of the large-scale timber construction business for non-residential buildings10×
  4. 3Expansion of thermal-calculation services and the zero-energy housing business10×
  5. 4Investment in core business systems and next-generation structural design systems8×
  6. 5Development and adoption of BIM solutions for wooden homes6×
  7. 6Stable growth in the housing sector and expansion of OEM adoption5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next