Komori
New Constructor's Network (7057) · InitiativeAdvanced

Integrated management of structural calculations, component supply and quality assurance under the SE Structural System

First written in FY2019. 2 of 5 entries say "Restated". Latest entry: FY2024-Q2.

5entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019 – FY20222019: 120192020: 020202021: 120212022: 120222023: 22023
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2024-Q2AdvancedAnnual report

    「As the company's voting rights ratio after the transaction was 40%, SE住宅ローンサービス became an equity-method affiliate from the second quarter of the current consolidated fiscal year and was excluded from the scope of consolidation.」

    The previously disclosed partial transfer of shares in SE住宅ローンサービス was completed during the quarter, and the company became an equity-method affiliate with a 40% voting rights interest.
  2. FY2024-Q1AdvancedAnnual report

    「At a meeting of the Board of Directors held on 12 July 2023, the company resolved to transfer part of its shares in its consolidated subsidiary SE住宅ローンサービス株式会社 and entered into a share transfer agreement with パブリックホールディングス株式会社 dated 12 July 2023. As a result, its voting rights ratio in SE住宅ローンサービス株式会社 changed from 100% to 40%, and the company was excluded from the scope of consolidation and became an equity-method affiliate.」

    Regarding housing finance support, the company disclosed a specific transaction involving the transfer of 60% of the shares in SE住宅ローンサービス and a transition to a joint venture with パブリックホールディングス. It stated that the partner's expertise and sales structure in housing finance services would be used to strengthen financial support for registered builders.
  3. FY2022RestatedAnnual report

    「We provide a one-stop service that addresses the issues faced by local builders and architectural firms, covering not only structural calculations and stable component supply but also verification of the thermal insulation performance of timber homes and the arrangement of guarantees and insurance,」

    The company continues to describe a business model integrating structural calculations, component supply, thermal insulation performance verification, and the arrangement of guarantees and insurance.
  4. FY2021RestatedAnnual report

    「By centrally managing everything from structural calculations and component supply to energy-efficiency calculations, performance guarantees and financial support, we have contributed to ensuring safety through improved earthquake resistance in timber buildings and to enhancing asset value.」

    The company reiterated its business model of centrally managing activities ranging from structural calculations to component supply and related services.
  5. FY2019First statedAnnual report

    「By centrally managing everything from structural calculations and component supply to thermal calculations, performance guarantees and financial support, we have contributed to ensuring safety through improved earthquake resistance in timber buildings and to enhancing asset value.」

    A proprietary business model combining allowable-stress calculations, supply of processed structural components and SE hardware, on-site inspections and performance guarantees. The company also cited a track record of structural calculations for more than 20,000 homes since its founding.
Moved together

"Expansion of the large-scale timber construction business for non-residential buildings" moved the same way as this thread, in the same document, in 2 of its 5 moves.

22★12
  1. ★This thread
  2. 1Expansion of the large-scale timber construction business for non-residential buildings2×
  3. 2Expansion of thermal-calculation services and the zero-energy housing business2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
New Constructor's Network's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.