Komori
Sanoyas Holdings (7022) · RiskWorsened

Costs Associated with Warranty Work and Product Liability

First written in FY2016. 2 of 6 entries say "Materialised", first in FY2017-Q2. Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017-Q3 – FY2017MaterialisedFY2024 – FY20262016: 220162017: 220172018: 020182019: 020192020: 020202021: 020212022: 020222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies
Changes in Balance of Provision for Completed Construction Work WarrantiesA theme 22 companies write about · 18 as a headwind · 1 as a tailwind

Sanoyas Holdings moved to the "Worse" side of this theme in 2024, 6 years after the typical company in this theme (2018).

The whole theme swung hardest in 2024: 5 of 12 companies on the "Worse" side.

1 other company's latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 22 companies compared. The sentences above are computed from all 22.
Full recordFilings, disclosures and news, newest first
  1. FY2026WorsenedAnnual report

    「Provision for warranty work: ¥66 million; provision for losses on contracts: ¥9 million; total: ¥76 million」

    The provision for warranty work increased from ¥40 million in the previous fiscal year to ¥66 million, resulting in higher costs associated with warranty work.
  2. FY2024MaterialisedAnnual report

    「Included in cost of sales were ¥108 million in provisions for warranty work and ¥50 million in provisions for losses on contracts, for a total of ¥158 million.」

    The provision for warranty work amounted to ¥108 million, and costs related to warranty work and product liability were recognized in the current year's financial statements.
  3. FY2017RestatedAnnual report

    「Damages: This was compensation for the customer's business losses during the warranty work carried out in the ship repair business.」

    The ¥47 million compensation for the customer's business losses related to warranty work in the ship repair business continues to be reported.
  4. FY2017-Q3RestatedAnnual report

    「Damages: This was compensation for the customer's business losses during the warranty work carried out in the ship repair business.」

    Compensation for the customer's business losses related to warranty work in the ship repair business continues to be reported as ¥47 million in damages.
  5. FY2017-Q2MaterialisedAnnual report

    「Damages: This was compensation for the customer's business losses during the warranty work carried out in the ship repair business.」

    The Company recognized ¥47 million in damages for the customer's business losses in connection with warranty work in the ship repair business.
  6. FY2016First statedAnnual report

    「The Group manufactures, installs and maintains products in accordance with its quality control standards. However, costs arising from warranty work borne by the Group, product liability and other matters may not be covered by insurance or other means and could affect the Group's operating results and financial condition.」

    While maintaining quality control, it identifies the potential for uncovered costs associated with warranty work and product liability.
Moved together

"Risk of Rising Interest Rates on Interest-Bearing Debt" moved the same way as this thread, in the same document, in 2 of its 6 moves.

22★12
  1. ★This thread
  2. 1Risk of Rising Interest Rates on Interest-Bearing Debt2×
  3. 2Exchange-Rate Fluctuations Associated with Imports, Exports, and Foreign-Currency-Denominated Contracts2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sanoyas Holdings's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.