Mitsubishi Heavy Industries (7011) · RiskWorsenedLatest Occurring Fact (2026-11-06): "Materialised"

Product Quality, Delivery Schedule and Safety Risks

First written in FY2016. 2 of 7 entries say "Restated". Latest entry: 2026-11-06.

7entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019MitigatedFY2021MaterialisedFY2023 – 2026-11-062016: 120162017: 120172018: 020182019: 120192020: 020202021: 120212022: 020222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies
Product Defect and Manufacturing Schedule Delay RiskA theme 16 companies write about · 16 as a headwind · 0 as a tailwind

Mitsubishi Heavy Industries moved to the "Worse" side of this theme in 2023, 1 year before the typical company in this theme (2024).

The whole theme swung hardest in 2025: 4 of 8 companies on the "Worse" side.

5 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 16 companies compared. The sentences above are computed from all 16.
Full recordFilings, disclosures and news, newest first
  1. 2026-11-06MaterialisedOccurring Fact

    「上記の対応を実施するに際し、2027 年3月期第2四半期の連結決算において、今後発生が見込まれる製品保証費用 675 億円を引当計上し、営業損失を計上いたしました。」

    勿来・広野IGCCプラントについて、今後の部品交換等に伴う製品保証費用675億円を引当計上し、製品品質・工事保証関連リスクが具体的な損失として発生した。
  2. FY2025WorsenedAnnual report

    「Balance at 1 April 2024 136,181 Increase during the period 74,067 Balance at 31 March 2025 156,931」

    Provisions related to product and construction warranties increased from ¥136.181 billion at the end of the previous fiscal year to ¥156.931 billion. This also includes provisions for the long-term maintenance contract for plant facilities delivered in fiscal 2021.
  3. FY2023MaterialisedAnnual report

    「As of the end of the current consolidated fiscal year, the group was carrying out improvement work on the plant facilities to enhance their reliability. It recognised provisions after reasonably estimating the compensation arising from the downtime associated with the improvement work and the total costs required to fulfil the long-term maintenance contract for the facilities.」

    For plant facilities delivered in prior fiscal years, improvement work to enhance reliability and compensation for downtime became necessary, and provisions related to losses on contract work and product warranties were recognised.
  4. FY2021MitigatedAnnual report

    「For large loss-making projects that occurred in the past, the group is working to prevent recurrence by reviewing their causes and countermeasures and reflecting the findings in internal training.」

    As measures addressing product quality, delivery, safety and cost deterioration risks, the group specified analysis of the causes of large loss-making projects, a review of countermeasures and internal training.
  5. FY2019RestatedAnnual report

    「The group continually works to improve product quality and reliability, but may face claims and lawsuits in Japan and overseas from contracting parties and other third parties concerning product performance, delivery issues or safety issues caused by its products.」

    The group continues to disclose risks of claims and lawsuits related to product performance, delivery, safety, specification changes and process delays.
  6. FY2017RestatedAnnual report

    「The group continually works to improve product quality and reliability, but may face claims and lawsuits in Japan and overseas from contracting parties and other third parties concerning product performance, delivery issues or safety issues caused by its products.」

    The group continues to disclose risks of claims and cost deterioration related to product performance, delivery, safety, specification changes and process delays.
  7. FY2016First statedAnnual report

    「The group continually works to improve product quality and reliability, but may face claims and lawsuits in Japan and overseas from contracting parties and other third parties concerning product performance, delivery issues or safety issues caused by its products.」

    The group disclosed claims and lawsuits concerning performance, delivery and safety, as well as cost deterioration caused by specification changes and process delays.
Moved together

"Risks from Natural Disasters, Accidents and BCPs" moved the same way as this thread, in the same document, in 2 of its 7 moves.

22★12
  1. ★This thread
  2. 1Risks from Natural Disasters, Accidents and BCPs2×
  3. 2Risk of limited sourcing options and rising material prices2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Mitsubishi Heavy Industries's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the Occurring Fact of 2026-11-06: "Materialised".