Komori
Helios Techno Holding (6927) · RiskRestated

Concentration of production and development sites in Himeji, Hyogo Prefecture, and Sakura, Chiba Prefecture

First written in FY2017. 3 of 4 entries say "Restated". Latest entry: FY2021.

4entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY20212017: 120172018: 020182019: 120192020: 120202021: 12021
Same theme, other companies

The whole theme swung hardest in 2020: 21 of 75 companies on the "Worse" side.

52 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 101 companies compared. The sentences above are computed from all 101.
Full recordFilings, disclosures and news, newest first
  1. FY2021RestatedAnnual report

    「当社グループの生産拠点は、兵庫県姫路市及び千葉県佐倉市に集中させております。地震や台風等の大規模自然災害によって、当社グループの生産・開発拠点等に甚大な損害を被り、当社グループの経営成績及び財政状態等に重大な影響を及ぼす可能性があります。」

    姫路市・佐倉市への生産拠点集中と自然災害リスクを再確認した。
  2. FY2020RestatedAnnual report

    「The Group's production sites are concentrated in Himeji, Hyogo Prefecture, and Sakura, Chiba Prefecture. A major natural disaster such as an earthquake or typhoon could cause extensive damage to the Group's production and development sites and materially affect its performance.」

    生産・開発拠点の姫路市・佐倉市への集中と自然災害リスクを再確認した。
  3. FY2019RestatedAnnual report

    「The Group's production sites are concentrated in Himeji, Hyogo Prefecture, and Sakura, Chiba Prefecture. A major natural disaster such as an earthquake or typhoon could cause extensive damage to the Group's production and development sites and materially affect its performance.」

    生産・開発拠点の姫路市・佐倉市への集中と自然災害リスクを再確認。
  4. FY2017First statedAnnual report

    「The Group's production sites are concentrated in Himeji, Hyogo Prefecture, and Sakura, Chiba Prefecture. A major natural disaster such as an earthquake or typhoon could cause extensive damage to the Group's production and development sites and materially affect its performance.」

    For the first time, identifies the regional concentration of production and development sites and the resulting operational risk from earthquakes, typhoons and other natural disasters.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Helios Techno Holding's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.