Komori
Kel (6919) · RiskAdded an overseas production site

Risk of Production Activities Being Halted or Disrupted by Large-Scale Disasters

First written in FY2018. 4 of 6 entries say "Restated". Latest entry: FY2025.

6entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018 – FY20252018: 120182019: 120192020: 120202021: 120212022: 120222023: 020232024: 020242025: 12025
Same theme, other companies

The whole theme swung hardest in 2018: 33 of 133 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 188 companies compared. The sentences above are computed from all 188.Comparing 200 of the theme's 555 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025Added an overseas production siteAnnual report

    「The Group has 2 domestic production sites in Yamanashi Prefecture and 1 in Nagano Prefecture, and 1 overseas production site in Zhuhai, China, while its outsourced production sites are located in Japan and overseas.」

    In addition to the conventional 3 domestic sites and outsourced production sites, the Company's own production site in Zhuhai, China was disclosed, changing the composition of its production sites.
  2. FY2022RestatedAnnual report

    「The Group has 2 domestic production sites in Yamanashi Prefecture and 1 in Nagano Prefecture, while its outsourced production sites are located in Japan and overseas.」

    The risk of major natural disasters and infrastructure damage affecting 3 domestic production sites and outsourced production sites in Japan and overseas is continuing, with site diversification and the BCP serving as responses.
  3. FY2021RestatedAnnual report

    「The Group has 2 domestic production sites in Yamanashi Prefecture and 1 in Nagano Prefecture, while its outsourced production sites are located in Japan and overseas. If a major natural disaster occurs in the relevant region and causes a power outage or other extensive infrastructure damage, it could affect production activities.」

    The risk of major natural disasters and infrastructure damage affecting 3 domestic production sites and outsourced production sites in Japan and overseas is continuing, with site diversification and the BCP serving as responses.
  4. FY2020RestatedAnnual report

    「The Group has 2 domestic production sites in Yamanashi Prefecture and 1 in Nagano Prefecture, while its outsourced production sites are located in Japan and overseas. If a major natural disaster occurs in the relevant region and causes a power outage or other extensive infrastructure damage, it could affect production activities.」

    The risk of major natural disasters and infrastructure damage affecting 3 domestic production sites and outsourced production sites in Japan and overseas is continuing. Dispersing production sites and restoring operations based on the BCP are identified as responses.
  5. FY2019RestatedAnnual report

    「The Group has 2 domestic production sites in Yamanashi Prefecture and 1 in Nagano Prefecture, while its outsourced production sites are located in Japan and overseas. If a major natural disaster occurs in the relevant region and causes a power outage or other extensive infrastructure damage, it could affect production activities.」

    The risk of major natural disasters and infrastructure damage affecting 3 domestic production sites and outsourced production sites in Japan and overseas is continuing.
  6. FY2018First statedAnnual report

    「If a major natural disaster occurs in the relevant region and causes a power outage or other extensive infrastructure damage, it could affect production activities.」

    The impact on production from major natural disasters, power outages, and infrastructure damage at the domestic production sites in Yamanashi and Nagano and at outsourced production sites in Japan and overseas is recorded for the first time.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Kel's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.