Ferrotec (6890) · InitiativeDropped
Environmental equipment replacement and phased resumption of mass production at the Shanghai subsidiary
First written in FY2018-Q3. 1 of 2 entries say "Dropped", first in FY2018. Latest entry: FY2018.
2entries
1years
0from disclosures
How it moved
Same theme, other companies
Replacement of water supply and wastewater treatment equipment and resumption of mass production at a Shanghai subsidiaryA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2018DroppedAnnual report
「The Company operates numerous plants and is required to comply with the environmental standards of each country and region in which they are located.」
The specific measures described previously for the Shanghai subsidiary, including replacement of water supply and wastewater treatment facilities, trial operations and the phased resumption of mass production, are not repeated in the current-year text. - FY2018-Q3First statedAnnual report
「We are carrying out equipment replacement work on water supply and wastewater treatment facilities and other equipment to meet the applicable standards. The plant will therefore suspend operations temporarily, conduct trial operations sequentially as equipment replacement is completed, and carry out monitoring before gradually moving to mass production with equipment that has cleared the applicable standards.」
The company specified its response measures: replacing water supply and wastewater treatment facilities and other equipment, conducting trial operations and monitoring, and gradually commencing mass production with equipment that has cleared the applicable standards.