Construction of an R&D Center
First written in FY2016. 4 of 6 entries say "Cited as achieved", first in FY2018. Latest entry: FY2022.
No other company in this theme has enough history to compare yet.
- FY2022Cited as achievedAnnual report
「With the R&D center established in June 2017 as a base, we have established a structure to strengthen the Group's overall capabilities and technological development capabilities. We will continue working to further raise and standardise our technological capabilities by deploying the accumulated advanced technical information horizontally across the Group.」
The horizontal deployment of technical information from the R&D center established in June 2017, together with the strengthening of the Group's overall capabilities and technological development capabilities, continues to be cited as an achievement. - FY2021Cited as achievedAnnual report
「With the R&D center established in June 2017 as a base, we have established a structure to strengthen the Group's overall capabilities and technological development capabilities. We will continue working to further raise and standardise our technological capabilities by deploying the accumulated advanced technical information horizontally across the Group.」
With the R&D center established in June 2017 as a base, the Group continues to strengthen its overall capabilities and technological development capabilities by deploying technical information horizontally across the Group. - FY2019Cited as achievedAnnual report
「In the FA industry, it is essential not to lose sight of the direction of development. Two years have passed since the R&D center was opened, having been built to promote interaction between departments, and its effects are now becoming apparent.」
Regarding the R&D center built in June 2017, two years have passed since its opening, and its effects through interaction between departments are becoming apparent. - FY2018Cited as achievedAnnual report
「In June 2017, we built an R&D center on the site adjoining our head office in Suruga-ku, Shizuoka City, consolidating the technology development and engineering teams in one location and establishing a structure to further strengthen the Group's overall capabilities and technological development capabilities.」
Regarding the R&D center built in the previous period, the concentration of the technology departments has stimulated interaction between departments and led to the creation of new products. - FY2017AchievedAnnual report
「With construction of the R&D center on the site adjoining our head office in Suruga-ku, Shizuoka City, scheduled for completion in June 2017 and operations scheduled to begin in July 2017, we established a structure that consolidates the previously dispersed technology development and engineering teams in one location, enabling us to draw on the Group's overall capabilities. We will therefore continue working to further enhance our technological proposal capabilities.」
Construction of the planned R&D center was completed in June 2017, establishing a structure that brings together the technology development and engineering teams. Operations were scheduled to begin in July 2017. - FY2016First statedAnnual report
「R&D center; Suruga-ku, Shizuoka City, Shizuoka Prefecture; building; 350,000; internal funds; January 2017; July 2017; building; 2,317 m²」
The plan calls for an R&D center with internal funding of ¥350 million, construction beginning in January 2017 and scheduled for completion in July of the same year, and a building area of 2,317 m².