Building demolition costs associated with reconstruction of the welfare building
First written in FY2023-Q1. 2 of 11 entries say "Softened", first in FY2026-H1. Latest entry: FY2026.
Rion moved to the "Worse" side of this theme in 2026, 4 years after the typical company in this theme (2022).
The whole theme swung hardest in 2026: 3 of 6 companies on the "Worse" side.
0 other companies' latest entry also says "Softened".
- FY2026Building demolition costs no longer recordedAnnual report
「Building demolition costs 114,510 -」
Building demolition costs related to the rebuilding of the Welfare Building were not recorded in FY2026, compared with ¥115 million in the previous fiscal year. - FY2026-H1No building demolition costs recorded in the interim periodAnnual report
「Building demolition costs 102,200 -」
Building demolition costs related to the rebuilding of the Welfare Building were not recorded in the current interim period, compared with ¥102 million in the interim period of the previous year. Meanwhile, the loss on disposal of fixed assets increased. - FY2025Welfare-building reconstruction costs increased again year on yearAnnual report
「Extraordinary losses Loss on disposal of fixed assets 41,238 Building demolition costs 114,510 Excavation survey costs for buried cultural properties 10,100 Donations 40,134」
In connection with the rebuilding of the Welfare Building, ¥114 million in building demolition costs, ¥10 million in excavation survey costs for buried cultural properties and ¥40 million in donations for part of the land were recorded as extraordinary losses. - FY2025-H1Welfare-building reconstruction costs increased again year on yearAnnual report
「Building demolition costs - 102,200」
¥102 million in building demolition costs related to the rebuilding of the Welfare Building was recorded as an extraordinary loss. This expense did not occur in the first half of the previous year and was a factor behind the decline in interim net income. - FY2024Extraordinary losses related to welfare-building reconstruction decreasedAnnual report
「The company recorded ¥38,500 thousand in building demolition costs and ¥38,618 thousand in archaeological excavation survey costs as extraordinary losses.」
Extraordinary losses related to the reconstruction of the welfare building decreased, with building demolition costs falling from ¥204 million in the previous fiscal year to ¥39 million and archaeological excavation survey costs falling from ¥95 million to ¥39 million. - FY2024-Q3Extraordinary losses related to welfare-building reconstruction decreased year on yearAnnual report
「Building demolition costs 203,552 - Archaeological excavation survey costs 49,800 28,818」
The ¥204 million in building demolition costs recorded in the same period of the previous year did not arise during the current cumulative quarter, while archaeological excavation survey costs decreased from ¥50 million to ¥29 million. - FY2024-Q1Extraordinary losses related to welfare-building reconstruction significantly reducedAnnual report
「Building demolition costs 180,360 - Archaeological excavation survey costs - 9,788」
The ¥180 million in building demolition costs recorded in the same period of the previous year was not recorded in the current quarter, leaving only ¥9.8 million in archaeological excavation survey costs. Extraordinary losses related to the reconstruction of the welfare building decreased from the same period of the previous year. - FY2023Full-year extraordinary losses related to welfare-building reconstruction recordedAnnual report
「The company recorded ¥203,552 thousand in building demolition costs and ¥95,182 thousand in archaeological excavation survey costs as extraordinary losses.」
In connection with the reconstruction of the welfare building, the company recorded ¥204 million in building demolition costs and ¥95 million in archaeological excavation survey costs as full-year extraordinary losses. - FY2023-Q3Extraordinary losses related to welfare-building reconstruction recordedAnnual report
「Building demolition costs - 203,552 Archaeological excavation survey costs - 49,800」
The company recorded ¥204 million in building demolition costs and ¥50 million in archaeological excavation survey costs associated with the reconstruction of the welfare building as extraordinary losses, temporarily widening the decline in net income. - FY2023-Q2Extraordinary losses related to welfare-building demolition increasedAnnual report
「As costs, including the demolition of the existing building in connection with the reconstruction of the welfare building on the company’s head-office premises in Kokubunji, Tokyo, were recorded as an extraordinary loss, the decline in profit temporarily widened.」
The company recorded ¥203.6 million in building demolition costs and ¥33.2 million in archaeological excavation survey costs, among other items, as extraordinary losses related to the reconstruction of the welfare building, temporarily widening the decline in net income. - FY2023-Q1First statedAnnual report
「As costs for demolishing the existing building in connection with the reconstruction of the welfare building on the company’s head-office premises in Kokubunji, Tokyo, were recorded as an extraordinary loss, the decline in profit temporarily widened. Building demolition costs - 180,360」
The company recorded ¥180 million in building demolition costs associated with the reconstruction of the welfare building as an extraordinary loss. This was cited as a factor behind the wider year-on-year decline in quarterly net income attributable to owners of the parent.