Agreements reached under this partnership
Business Alliances- 1
Intended for introduction into air-conditioning equipment installed at factory facilities
These are items that the documents state the two companies will work on. The lines above and below represent arrangements between the two companies.
We have determined that the impact of this supply agreement on the current fiscal year’s business will be minor, as the start-up of equipment installation will precede the second half of the fiscal year.
| Item | Details |
|---|---|
| Name of alliance partner | Major domestic manufacturing company (specific name not disclosed) |
| Alliance partner's location | Japan (specific location not disclosed) |
| Type of alliance | Business Alliances |
| Details of the alliance | Intended for introduction into air-conditioning equipment installed at factory facilities |
| Contract Date | 29 September 2026 |
| Impact on Business Performance | We have determined that the impact of this supply agreement on the current fiscal year’s business will be minor, as the start-up of equipment installation will precede the second half of the fiscal year. |
Items this document does not state (17)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To introduce “PURE-KALIS” as a system that addresses issues such as reduced air-conditioning equipment performance and increased power consumption in high-temperature environments, contributing to energy savings and stable operation.