Komori
Saxa (6675) · RiskRestated

Occurrence of Defective Products and Product Liability

First written in FY2016. 3 of 4 entries say "Restated". Latest entry: FY2019.

4entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY20192016: 120162017: 120172018: 120182019: 12019
Same theme, other companies
Product and Sold-Product Quality Defect, Quality Assurance and Product Liability RiskA theme 719 companies write about · 748 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2026: 12 of 60 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 194 companies compared. The sentences above are computed from all 194.Comparing 200 of the theme's 750 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2019RestatedAnnual report

    「The Group has obtained ISO 9001 certification and takes the utmost care to ensure product quality. However, there is no guarantee that the Group's products will not become defective in the future due to deterioration over time or unforeseen quality issues.」

    While implementing quality assurance systems, the risks of defective products, product liability and loss of confidence are reconfirmed.
  2. FY2018RestatedAnnual report

    「For product warranty costs, the Group recognizes a provision for product warranties based on estimates of after-sales service costs derived from past results, in preparation for after-sales service costs and other expenses arising for products already shipped. The Group works to improve quality through the thorough application of the three actualities principle and the operation of a wide-ranging quality control system. However, if the actual defect rate or repair costs differ from the estimates, it may become necessary to revise the estimated amount of after-sales service costs.」

    While conducting quality control and recognizing product warranty provisions, the possibility of additional costs arising from differences between estimated and actual defect rates or repair costs is reconfirmed.
  3. FY2017RestatedAnnual report

    「The Group has obtained ISO 9001 certification and takes the utmost care to ensure product quality. However, there is no guarantee that the Group's products will not become defective in the future due to deterioration over time or unforeseen quality issues.」

    The risk of defective products arising is reconfirmed while referring to quality assurance systems such as ISO 9001.
  4. FY2016First statedAnnual report

    「There is no guarantee that the Group's products will not become defective in the future due to deterioration over time or unforeseen quality issues.」

    While referring to quality control and ISO 9001 certification, the possibility of defects, liability for damages and loss of confidence is identified as a risk.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Saxa yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.