W-Scope (6619) · RiskMitigated
Delay in transitioning Line 5 to mass production
First written in FY2016-Q3. 1 of 2 entries say "Mitigated", first in FY2016. Latest entry: FY2016.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Production capacity shortfall due to a delayed transition of a production line to mass productionA theme 1 companies write about · 1 as a headwind · 0 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2016MitigatedAnnual report
「Line 5's technical issues have already been resolved, and since January 2017 it has achieved the production capacity specified in the original plan and transitioned to stable mass production.」
Although the transition to mass production on Line 5 was delayed by approximately 6 months from the original plan, the technical issues were resolved, and stable mass production at the planned capacity began in January 2017. - FY2016-Q3First statedAnnual report
「Installation of Line 5 has been completed, but the transition to mass production is expected to be delayed by approximately 6 months from the original plan. This is mainly due to technical factors, including measures to improve productivity. Although a path to resolution has already been established, the delay resulted in production falling below the planned volume.」
Line 5 has been installed, but the transition to mass production was delayed by approximately 6 months from the original plan due to technical factors, resulting in production below the planned volume.