Komori
Torex Semiconductor (6616) · RiskRestated

Difficulty of Changing Analog Semiconductor Manufacturing Lines and Concentration Among Contract Manufacturers

First written in FY2016. 5 of 6 entries say "Restated". Latest entry: FY2025.

6entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY20252016: 120162017: 020172018: 120182019: 020192020: 120202021: 120212022: 020222023: 020232024: 120242025: 12025
Same theme, other companies
Concentration of Outsourced Manufacturing at Specific FoundriesA theme 10 companies write about · 10 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2022: 3 of 6 companies on the "Worse" side.

2 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    It reconfirms the characteristics of analog power semiconductors, for which changing manufacturing lines takes an extended period, and the resulting supply risk from concentration of production sites.
  2. FY2024RestatedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    It reconfirms the supply risk arising from the difficulty of changing manufacturing lines for analog power semiconductors and the concentration of production sites and outsourcing partners.
  3. FY2021RestatedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    It reconfirms the characteristics of analog power semiconductors, for which changing manufacturing lines takes an extended period, and the resulting supply risk from concentration of production sites.
  4. FY2020RestatedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    It reconfirms the risk that production sites cannot easily be changed because changing manufacturing lines for analog power semiconductors takes approximately 2 years.
  5. FY2018RestatedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    It reconfirms the risk of supply concentration due to the difficulty of changing manufacturing lines for analog semiconductors and the high proportion of production outsourced to Fenitec and Renesas.
  6. FY2016First statedAnnual report

    「Approximately 2 years are required for tuning the manufacturing process and related work.」

    A large proportion of production is outsourced to Fenitec Semiconductor and Renesas Semiconductor Package & Test Solutions, indicating that deterioration in relationships with outsourcing partners or natural disasters could impede stable supply.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Torex Semiconductor yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.