Komori
Socionext (6526) · RiskMitigated

Supply constraints at outsourced manufacturers and improvements in manufacturing capacity

First written in FY2023-Q2. 4 of 6 entries say "Mitigated", first in FY2023-Q3. Latest entry: FY2024.

6entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2023-Q2MitigatedFY2023-Q3 – FY2023RestatedFY2024-Q1MitigatedFY2024-Q2 – FY20242022: 120222023: 420232024: 12024
Same theme, other companies
Risk of insufficient supply capacity and shutdowns at outsourced production partnersA theme 65 companies write about · 67 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2024: 10 of 32 companies on the "Worse" side.

15 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 65 companies compared. The sentences above are computed from all 65.
Full recordFilings, disclosures and news, newest first
  1. FY2024MitigatedAnnual report

    「As a result, a structure is being put in place to respond quickly to changes in the supply situation at outsourced manufacturers.」

    The disclosure states that integrating production and procurement organizations in Taiwan and Japan and placing a team responsible for managing outsourced manufacturers in Taiwan are establishing a framework for responding to supply constraints.
  2. FY2024-Q2MitigatedAnnual report

    「Although semiconductor manufacturers have continued to operate at high utilization rates, supply constraints have eased significantly.」

    While high utilization rates continued, supply constraints were described more strongly as having eased significantly.
  3. FY2024-Q1RestatedAnnual report

    「As a result, capacity constraints at semiconductor manufacturers have continued to ease.」

    The disclosure states that capacity constraints at semiconductor manufacturers continued to ease.
  4. FY2023MitigatedAnnual report

    「As of the filing date, we recognize that the capacity constraints at semiconductor manufacturers, caused by increased global semiconductor demand since the second half of the fiscal year ended March 2021, have eased, particularly for advanced technologies.」

    The disclosure states that capacity constraints at outsourced manufacturers had eased, particularly for advanced technologies.
  5. FY2023-Q3MitigatedAnnual report

    「As a result, utilization of the manufacturing capacity of outsourced manufacturers improved, and production capacity sufficient to meet customer demand was almost secured.」

    In addition to improved capacity utilization, the response to supply constraints had progressed to the point where production capacity sufficient to meet customer demand was almost secured.
  6. FY2023-Q2MaterialisedAnnual report

    「At the same time, supply shortages at the group's outsourced manufacturers were being resolved, particularly for advanced technologies, and capacity utilization improved.」

    Although the disclosure identifies supply shortages as an actual issue, it states that shortages, particularly for advanced technologies, were being resolved and capacity utilization was improving.
Moved together

"Moving projects using advanced processes of 7nm and below into mass production" moved the same way as this thread, in the same document, in 2 of its 6 moves.

222222★123456
  1. ★This thread
  2. 1Moving projects using advanced processes of 7nm and below into mass production2×
  3. 2Investment in reticles, test boards, development environments and IP macros2×
  4. 3Focus on 5G networks, automotive and smart devices2×
  5. 4Increase in NRE development projects using advanced processes2×
  6. 5Investment in research and development2×
  7. 6Executive compensation linked to performance, shareholder value and ESG2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Socionext's next results are scheduled for 2026-10-28. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Supply constraints at outsourced manufacturers and improvements in manufacturing capacity | Socionext Inc. (6526) | Komori