Regular disaster-prevention inspections of production equipment
First written in FY2017. 2 of 4 entries say "Restated". Latest entry: FY2022.
7 other companies' latest entry also says "Restated".
- FY2022RestatedAnnual report
「To minimize the impact of interruptions to its manufacturing lines, the Group conducts regular disaster-prevention inspections of production equipment and other facilities, and prepares BCP plans and conducts regular drills.」
It continues disaster response measures through regular inspections of production equipment, BCP plans and regular drills. - FY2020AdvancedAnnual report
「To minimize the impact of interruptions to its manufacturing lines, the Group conducts regular disaster-prevention inspections of production equipment and other facilities, and prepares BCP plans and conducts regular drills.」
It has expanded its measures beyond regular inspections of production equipment to include preparing BCP plans and conducting regular drills. - FY2018RestatedAnnual report
「To minimize the impact of interruptions to its manufacturing lines, the Group conducts regular disaster-prevention inspections of production equipment and other facilities.」
It continues regular inspections of production equipment as a measure against manufacturing-line interruptions caused by natural disasters and other events. - FY2017First statedAnnual report
「To minimize the impact of interruptions to its manufacturing lines, the Group conducts regular disaster-prevention inspections of production equipment and other facilities.」
It specifically describes regular inspections of production equipment for the first time as a measure to mitigate the impact of manufacturing-line interruptions caused by natural disasters and other events.