Komori
Tve (6466) · InitiativeAdvanced

Core System Platform Upgrade and Enhancement

First written in FY2017. 2 of 3 entries say "Advanced", first in FY2018. Latest entry: FY2020.

3entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017AdvancedFY2018 – FY20202017: 12018: 120182019: 020192020: 12020
Same theme, other companies
Investment in Upgrading Core Business SystemsA theme 170 companies write about · 5 as a headwind · 164 as a tailwind

86 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 170 companies compared. The sentences above are computed from all 170.
Full recordFilings, disclosures and news, newest first
  1. FY2020AdvancedAnnual report

    「Total capital expenditure during the consolidated fiscal year was ¥367.940 million. By segment, the valve business acquired a system bandsaw and automatic welding equipment, while the valve and steelmaking businesses jointly carried out enhancements to the core systems.」

    The company continued capital expenditure, including enhancements to the core systems, bringing total capital expenditure for the fiscal year to ¥367 million.
  2. FY2018AdvancedAnnual report

    「In the valve business, the company acquired an automatic welding machine manufactured by Skywell. For both the valve and steelmaking businesses, it also renewed and enhanced the core systems platform and renewed existing equipment, including heat-treatment furnace cars.」

    The company continued to renew and enhance the core systems platform. Software additions during the fiscal year amounted to ¥209 million, and major investment amounts for the core systems platform renewal and related projects were also recorded.
  3. FY2017First statedAnnual report

    「Total capital expenditure during the consolidated fiscal year was ¥430 million. By segment, the valve business renewed existing equipment, including factory air-conditioning equipment and a 15-ton monorail blast machine. For both the valve and steelmaking businesses, the company also renewed and enhanced the core systems platform.」

    The company carried out capital expenditure to renew and enhance the core systems platform. Specific investment results addressing system shutdown risk and strengthening the operational infrastructure were described for the first time.
Moved together

"Recovery in the nuclear power market and earnings recovery driven by periodic inspection projects" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222222★123456
  1. ★This thread
  2. 1Recovery in the nuclear power market and earnings recovery driven by periodic inspection projects2×
  3. 2Payment of Interim and Year-End Dividends2×
  4. 3Response to nuclear power plant restart preparation work and thermal power plant repair work2×
  5. 4Repayment of Bank Borrowings and Short-Term Investment of Surplus Funds2×
  6. 5Disappearance of periodic inspection projects for nuclear power plants following the Fukushima Daiichi accident2×
  7. 6Expansion from Regional Decontamination into Fukushima Daiichi Nuclear Power Station-Related Operations2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Tve's next results are scheduled for 2026-11-12. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.