Expanding orders by strengthening the engineering business
First written in FY2016. 15 of 33 entries say "Restated". Latest entry: 2026-08-07.
The whole theme swung hardest in 2021: 1 of 8 companies on the "Worse" side.
6 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「In the engineering business, amid growing uncertainty surrounding global carbon-neutral investment trends and the international situation, we recognize that securing a stable order flow and strengthening execution capabilities are challenges. Even under these conditions, we steadily captured business opportunities, including completing a demonstration plant for green ammonia production and receiving orders for semiconductor-related facilities.」
While engineering orders received declined 7.2% from the previous fiscal year, the company reported concrete progress in its target areas, including completion of a green ammonia production demonstration plant and orders for semiconductor-related facilities. - FY2026-H1AdvancedAnnual report
「Orders and revenue from completed construction increased year on year in all three fields: maintenance, tanks and engineering. The main driver in maintenance was scheduled repair projects, in tanks it was maintenance work, and in engineering it was large-scale projects.」
In the engineering field, orders received and completed construction contracts increased mainly due to large-scale projects, while completed construction contracts in the revenue segment increased from ¥17,193 million in the same period of the previous year to ¥21,448 million. - FY2025AdvancedAnnual report
「In the engineering field, both orders received and completed construction contracts increased, mainly due to small- and medium-sized projects.」
Despite the negative reaction to the large-scale project orders recorded in the previous fiscal year, engineering orders received increased 2.8% year on year and completed construction contracts increased 10.9% due to an increase in small- and medium-sized projects. The company has also expanded its order targets to include closed refineries, nonferrous metals, and decarbonization-related projects. - FY2025-H1Increase in small- and medium-sized projects and decline in completed construction contractsAnnual report
「In the engineering field, although there was a negative reaction to the large-scale project orders recorded in the same period of the previous year, orders received remained at the same level as the previous year due to an increase in small- and medium-sized projects. In terms of completed construction contracts, tank projects increased in the engineering field, but the decline in other projects resulted in a year-on-year decrease.」
In the engineering field, while there was a negative reaction to the large-scale project orders recorded in the same period of the previous year, orders received remained at the same level as the previous year due to an increase in small- and medium-sized projects. Completed construction contracts declined year on year because the increase in tank projects was outweighed by the decline in other projects. - FY2024Orders received were at the same level, while completed construction contracts declinedAnnual report
「The engineering field remained at the same level as the previous fiscal year due to orders for large-scale projects, as in the previous fiscal year.」「The engineering field declined from the same period of the previous year because modification work and new facility construction decreased.」
While orders received were at the same level as the previous fiscal year due to large-scale project orders, completed construction contracts declined 20.2% from the previous fiscal year due to lower modification work and new facility construction. - FY2024-Q3RestatedAnnual report
「The engineering field declined from the same period of the previous year, which had benefited from orders for large-scale projects.」「The engineering field declined from the same period of the previous year because modification work and new facility construction decreased.」
The company continues to explain that orders received declined due to the absence of the large-scale project orders recorded in the same period of the previous year, while completed construction contracts also declined due to lower modification work and new facility construction. - FY2024-Q2Decline in engineering orders received and completed construction contractsAnnual report
「The engineering field declined from the same period of the previous year, which had benefited from orders for large-scale projects.」「The engineering field declined from the same period of the previous year due to lower completed construction contracts for modification work.」
Orders received declined due to the absence of the large-scale project orders recorded in the same period of the previous year, and completed construction contracts for modification work also declined year on year. - FY2024-Q1Engineering orders received were at the same level, while completed construction contracts declined slightlyAnnual report
「The engineering field remained at the same level.」「The engineering field declined slightly from the previous fiscal year due to lower completed construction contracts for modification work.」
While orders received in the engineering field were at the same level as the previous year, completed construction contracts for modification work declined slightly year on year. - FY2023-Q3AdvancedAnnual report
「In the engineering field, orders received were at the same level as the previous year due to orders for modification work and new facility construction. Completed construction contracts increased year on year in the maintenance field due to a higher volume of scheduled maintenance work. In the engineering field, completed construction contracts also increased year on year due to revenue recognized as modification work and new facility construction progressed.」
While orders received in the engineering field were at the same level as the previous year, completed construction contracts increased year on year due to revenue recognized as modification work and new facility construction progressed. - FY2023-Q2AdvancedAnnual report
「In the engineering field, orders increased from the previous fiscal year due to orders for large-scale projects.」「In the engineering field, orders increased from the previous fiscal year due to an increase in modification work and other projects.」
Orders received in the engineering field increased due to large-scale projects, while completed construction contracts also increased due to an increase in modification work and other projects. - FY2023-Q1RestatedAnnual report
「In light of these circumstances, in maintenance we will seek to expand orders and completed construction work in routine maintenance and modification and refurbishment projects. In engineering, we will seek to expand orders and completed construction work for plants manufacturing high-performance products, such as general chemicals and electronic materials, as well as renewable-energy-related projects.」
The company continues to target manufacturing plants for high-performance products such as general chemicals and electronic materials, as well as renewable energy-related projects, for order expansion in the engineering field. - FY2022AdvancedAnnual report
「Breakdown of orders received by type of construction Maintenance 90,167 △10.9% Engineering 51,062 21.9%」
Orders received for engineering work increased 21.9% from the previous fiscal year to ¥51,062 million, demonstrating tangible results from the expansion of engineering orders. - FY2022-Q3RestatedAnnual report
「In response, in maintenance we will seek to expand orders and completed construction work in routine maintenance and tank-related projects. In engineering, we will seek to expand orders and completed construction work for plants manufacturing high-performance products, such as general chemicals and electronic materials, as well as renewable-energy-related projects.」
The company has reaffirmed its policy of targeting manufacturing plants for high-performance products such as general chemicals and electronic materials, as well as renewable energy-related projects, for order expansion in the engineering field. - FY2022-Q2RestatedAnnual report
「The previous fiscal year was one in which there were many turnaround projects related to oil and petrochemicals in the maintenance business. Because there are expected to be fewer such projects in the current fiscal year, orders and completed construction work are expected to decline for the full year. In response, in maintenance we will seek to expand orders and completed construction work in routine maintenance and tank-related projects. In engineering, we will seek to expand orders and completed construction work for plants manufacturing high-performance products, such as general chemicals and electronic materials, as well as renewable-energy-related projects.」
The company has reaffirmed its policy of targeting manufacturing plants for high-performance products such as general chemicals and electronic materials, as well as renewable energy-related projects, for order expansion in the engineering field. - FY2022-Q1RestatedAnnual report
「In the engineering field, we will work to expand orders received and completed construction contracts for manufacturing plants for high-performance products such as general chemicals and electronic materials, as well as renewable energy-related projects.」
The company continues to identify manufacturing plants for high-performance products such as general chemicals and electronic materials, as well as renewable energy-related projects, as targets for order expansion and means of strengthening the engineering business. - FY2021Declines in orders received and completed construction contracts for new facility construction, and expansion into decarbonization projectsAnnual report
「New facility construction ¥34,533 ¥11,502 △¥23,031 △66.7%」「New facility construction ¥22,598 ¥17,672 △¥4,925 △21.8%」「The company aims to expand orders for investment projects aimed at a decarbonized society, including renewable energy, as a new business area」
While orders received for new facility construction declined 66.7% year on year and completed construction contracts declined 21.8%, the company indicated a policy of expanding its order targets to include decarbonization-related investment projects such as renewable energy. - FY2021-Q3Specific factors behind the substantial decline in orders for new facility constructionAnnual report
「In the plant construction field, we are working to ensure the smooth progress of projects received and focusing on securing orders for investment projects involving high-performance products, mainly in the general chemicals field. Orders for new facility construction declined substantially from the same period of the previous year. The reasons were that, in the second quarter of the fiscal year ended March 2020, new facility construction accounted for a substantial amount of the order backlog of JX Engineering Corporation, which was accepted as orders received by RAIZNEXT Corporation at the time of the management integration; increased competition resulting from an overall decline in construction projects; the postponement of some projects due to the impact of infectious diseases; and the cancellation of construction plans due to lower product demand.」
While continuing to focus on securing orders for investment projects involving high-performance products, mainly in the general chemicals field, the company attributed the substantial decline in orders for new facility construction to the unusual comparison base resulting from the previous year’s management integration, a decline in construction projects and intensified competition, postponements due to infectious diseases, and cancellations of plans due to lower product demand. - FY2020AdvancedAnnual report
「We will seek orders for these investment projects through solution-based services, including involvement from the customer’s business-planning stage and stronger support systems.」「New facility construction: ¥22,598 million (up 323.7% year on year)」
In the engineering business, the company specified solution-based services involving participation from the customer’s business-planning stage, while completed new facility construction contracts increased substantially. - FY2020-Q3RestatedAnnual report
「Although the group expects scheduled repair projects to remain solid in the fiscal year ending March 2020, it also worked to expand orders for plant reinforcement projects, modification and renovation projects, and new plant construction projects for the production of high-function products.」
In the engineering field, the company continues to work to expand orders for plant resilience projects, modification and refurbishment, and new plant construction for high-performance products. - FY2020-Q2RestatedAnnual report
「Make orders for plant resilience projects, modification and refurbishment work, and new plant construction for the production of high-performance products the top priority」
The company continues to make securing orders for engineering work involving plant resilience projects, modification and refurbishment, and new plant construction for high-performance products a top priority. - FY2020-Q1RestatedAnnual report
「The group expects scheduled repair projects to remain solid in the fiscal year ending March 2020 and will give top priority to securing orders for plant reinforcement projects, modification and renovation projects, and new plant construction projects for the production of high-function products, while working to maintain profitability through reductions in direct construction costs and expenses.」
The company continues to make securing orders for plant resilience projects, modification and refurbishment work, and new plant construction for high-performance products a top priority. - FY2019-Q2RestatedAnnual report
「As plant resilience projects, modification and refurbishment work to address aging facilities and ensure stable operations, and new plant construction projects for the production of high-performance products are expected to continue, securing orders for this work will be our top priority.」
The company continues to state its policy of securing orders for plant resilience projects, modification and refurbishment to address aging facilities and ensure stable operations, and new plant construction. - FY2019-Q1RestatedAnnual report
「The group expects scheduled repair projects in the fiscal year ending March 2019 to increase from the previous fiscal year and anticipates continued demand for plant reinforcement projects, modification and renovation projects to address aging and ensure stable operations, and new plant construction projects for the production of high-function products. Accordingly, it will give top priority to securing orders for these projects and work to maintain profitability by reducing the cost of direct construction expenses and continuously cutting overhead in response to rising material prices, labor costs and subcontract processing costs.」
The company continues to target orders for plant resilience projects, modification and refurbishment to address aging facilities and ensure stable operations, and new plant construction for high-performance products, stating that these will be its top priority during the current period. - FY2018-Q1RestatedAnnual report
「Meanwhile, as plant resilience projects, modification and refurbishment work to address aging facilities and ensure stable operations, and new plant construction projects for the production of high-value-added products are expected to continue, we will work to secure orders for these projects.」
The company continues to pursue a policy of securing orders for plant resilience projects, modification and refurbishment work, and new plant construction. - FY2017RestatedAnnual report
「As plant resilience projects, modification and refurbishment work to address aging facilities and ensure stable operations, and new plant construction projects for the production of high-value-added products are expected to continue, we will work to secure orders for these projects.」
The company continues to pursue a policy of securing orders for plant resilience projects, modification and refurbishment work, and new plant construction. - FY2017-Q3RestatedAnnual report
「Securing orders for plant resilience projects; modification and refurbishment work associated with reduced refining capacity and facility closures; new investment projects through petrochemical-complex cooperation; and new plant construction projects for the production of competitive products」
The company has reaffirmed its policy of securing orders for the reinforcement, modification and refurbishment of existing facilities, cooperation within petrochemical complexes, and new plant construction. - FY2017-Q2RestatedAnnual report
「In this environment, for the fiscal year ending March 2017, a peak period for scheduled repair projects, the group as a whole worked to secure orders for scheduled repair projects, plant reinforcement projects, modification and renovation projects associated with the retirement of facilities, new investment projects undertaken through collaboration within industrial complexes, and new plant construction projects for the production of competitive products.」
The company has reaffirmed its policy of securing engineering orders, including plant resilience projects, modification and refurbishment associated with facility closures, cooperation within petrochemical complexes, and new plant construction. - FY2017-Q1RestatedAnnual report
「We will continue working to secure orders for plant resilience projects; modification and refurbishment work associated with reduced refining capacity and facility closures; new investment projects through petrochemical-complex cooperation; and new plant construction projects for the production of competitive products.」
The company has reiterated its policy of expanding engineering orders, targeting orders for the reinforcement, modification and refurbishment of existing facilities, cooperation within petrochemical complexes, and new plant construction. - FY2016First statedAnnual report
「Expanding orders for small- and medium-sized plant construction by entering the market through FS and FEED operations」「Expanding orders for modification and refurbishment work on large-scale equipment by leveraging experience with specialized projects」「Expanding orders for new construction investment projects, mainly in general chemicals」
The company is using entry through FS and FEED, leveraging its experience with specialized projects, and new construction investment projects in general chemicals to expand orders.