Delivery schedules, personnel, costs, and technical and quality risks for large-scale, long-term plant projects

First written in FY2017. 4 of 5 entries say "Restated". Latest entry: FY2023.

5entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY20232017: 120172018: 120182019: 120192020: 020202021: 120212022: 020222023: 12023
Same theme, other companies
Risk of Quality Issues and Deteriorating Profitability in Large Contract-Based ProjectsA theme 19 companies write about · 19 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2020: 6 of 11 companies on the "Worse" side.

3 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 19 companies compared. The sentences above are computed from all 19.
Full recordFilings, disclosures and news, newest first
  1. FY2023RestatedAnnual report

    「Some projects are large in scale and require lengthy construction periods, creating risks of delivery and construction delays, difficulty securing labor, higher costs, and technical or quality problems, any of which could affect the operating results and financial condition of the Group.」

    The company continues to disclose risks involving delivery schedules, staffing, costs, and technical and quality matters associated with large, long-term plant projects.
  2. FY2021RestatedAnnual report

    「Some projects are large in scale and require lengthy construction periods, creating risks of delivery and construction delays, difficulty securing labor, higher costs, and technical or quality problems, any of which could affect the operating results and financial condition of the Group.」

    The risks involving delivery schedules, personnel, costs, and technical and quality issues for large-scale, long-term plant projects are reiterated as business risks.
  3. FY2019RestatedAnnual report

    「Some projects are large in scale and require lengthy construction periods, creating risks of delivery and construction delays, difficulty securing labor, higher costs, and technical or quality problems, any of which could affect the operating results and financial condition of the Group.」

    The risks involving delivery schedules, personnel, costs, and technical and quality issues for large-scale, long-term plant projects are reiterated as business risks.
  4. FY2018RestatedAnnual report

    「Some projects are large in scale and require lengthy construction periods, creating risks of delivery and construction delays, difficulty securing labor, higher costs, and technical or quality problems, any of which could affect the operating results and financial condition of the Group.」

    The annual report continues to identify the risks of delays, securing personnel, rising costs, and technical and quality issues arising from large-scale, long-term projects.
  5. FY2017First statedAnnual report

    「Some projects are large in scale and require lengthy construction periods, creating risks of delivery and construction delays, difficulty securing labor, higher costs, and technical or quality problems, any of which could affect the operating results and financial condition of the Group.」

    In connection with the turnkey contracting model for plant engineering, the company has disclosed for the first time that delays, securing personnel, rising costs, and technical and quality issues in large-scale, long-term projects are risks.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Kimura Chemical Plants yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.