Komori
Toyo Kanetsu K.K. (6369) · RiskMitigated

Business continuity risks from natural disasters and other events

First written in FY2016. 6 of 16 entries say "Materialised", first in FY2019-Q3. Latest entry: 2026-09-25.

16entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018RestatedFY2021MitigatedFY2024-Q2 – 2026-09-252016: 120162017: 120172018: 120182019: 220192020: 320202021: 220212022: 020222023: 220232024: 120242025: 120252026: 22026
Same theme, other companies
Emergency Response Framework Based on a Business Continuity Plan (BCP)A theme 310 companies write about · 75 as a headwind · 239 as a tailwind

Toyo Kanetsu K.K. moved to the "Worse" side of this theme in 2019, 5 years before the typical company in this theme (2024).

The whole theme swung hardest in 2020: 22 of 111 companies on the "Worse" side.

4 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 195 companies compared. The sentences above are computed from all 195.Comparing 200 of the theme's 315 threads.
Full recordFilings, disclosures and news, newest first
  1. 2026-09-25MitigatedM&A and Subsidiary Changes

    「さらに、現工場と新工場の機能分担により、生産・保管機能の継続性を高め、地震・水害等の災害リスクへの対応力を強化することで、当社物流ソリューション事業の安定的な事業運営および持続的成長に資する体制の構築を目指します。」

    現工場と新工場の機能分担による生産・保管機能の継続性向上と、地震・水害等への対応力強化が示されている。
  2. FY2026MitigatedAnnual report

    「The Company is working to further strengthen business continuity by conducting practical BCP drills based on scenarios including an earthquake directly beneath the Tokyo metropolitan area and a Nankai Trough earthquake.」

    As part of its response to natural disaster and epidemic risks, the Company conducts practical drills based on large-scale earthquake scenarios in addition to its BCP measures.
  3. FY2026-H1MitigatedAnnual report

    「Losses due to disasters 9 −」

    Losses due to disasters fell from ¥9 million in the same period of the previous year to zero in the current interim consolidated accounting period, reducing their impact on current-period earnings.
  4. FY2025-H1MitigatedAnnual report

    「Losses due to disasters 517 9」

    Losses due to disasters decreased from ¥517 million in the same period of the previous year to ¥9 million, reducing their impact on earnings for the current interim consolidated accounting period.
  5. FY2024-Q2MitigatedAnnual report

    「In addition to recognizing a ¥449 million gain on sales of property, plant and equipment, mainly from the sale of assets by overseas subsidiaries, the Company recognized ¥517 million in flood damage caused by heavy rain in June 2023 as an extraordinary loss. Most of the flood damage is expected to be covered by insurance proceeds, and a corresponding extraordinary gain is expected to be recognized during the current consolidated fiscal year.」

    Flood damage caused by heavy rain and the resulting extraordinary loss of ¥517 million have occurred, while most of the damage is expected to be covered by property insurance proceeds.
  6. FY2024-Q1MaterialisedAnnual report

    「In addition, the Company recognized ¥517 million in flood damage caused by heavy rain in June 2023 as an extraordinary loss during the cumulative first quarter of the current consolidated fiscal year. Most of this damage is expected to be covered by insurance proceeds, and a corresponding extraordinary gain is expected to be recognized from the second quarter onward.」

    Flood damage caused by heavy rain in June 2023 occurred, resulting in the recognition of an extraordinary loss of ¥517 million. Most of the damage is expected to be covered by insurance proceeds.
  7. FY2021RestatedAnnual report

    「The Group has prepared business continuity plan (BCP) manuals in preparation for fires, earthquakes, large-scale natural disasters and epidemics. It has taken measures necessary for business continuity, including establishing communication systems, maintaining disaster supplies, carrying out seismic reinforcement work at major domestic manufacturing and development sites, and installing evacuation shelters.」

    The Company continues its BCP response to natural disasters and has expanded the measures described to include epidemics, disaster supplies, seismic reinforcement and evacuation shelters.
  8. FY2021-Q3MaterialisedAnnual report

    「Losses due to disasters − 13」

    A ¥13 million disaster-related loss was recognized in the cumulative third quarter of the current consolidated fiscal year, and disaster-related losses have been realized.
  9. FY2021-Q2MaterialisedAnnual report

    「Losses due to disasters − 9」

    A ¥9 million disaster-related loss was recognized in the cumulative second quarter of the current consolidated fiscal year, and disaster-related losses have been realized.
  10. FY2021-Q1MaterialisedAnnual report

    「Losses due to disasters − 7」

    A ¥7 million disaster-related loss was recognized in the cumulative first quarter of the current consolidated fiscal year, and disaster-related losses were reflected in current-period earnings.
  11. FY2020-Q3RestatedAnnual report

    「The Company’s Chiba facility and inventories were damaged by Typhoon No. 15 in September 2019 and Typhoon No. 19 in October 2019. Damage and restoration costs are expected to arise, but because it is currently difficult to reasonably estimate the net loss, including the amount to be recovered under insurance, the Company has not recognized a provision for disaster-related losses or accrued insurance proceeds receivable.」

    The Company reconfirmed the damage to its Chiba facility and inventories caused by Typhoons No. 15 and No. 19, as well as the difficulty of reasonably estimating the net loss.
  12. FY2020-Q2MaterialisedAnnual report

    「The Company’s Chiba facility and inventories were damaged by Typhoon No. 15 in September and Typhoon No. 19 in October of this year. Damage and restoration costs are expected to arise, but because it is currently difficult to reasonably estimate the net loss, including the amount to be recovered under insurance, the Company has not recognized a provision for disaster-related losses or accrued insurance proceeds receivable.」

    Typhoons No. 15 and No. 19 caused actual damage to the Chiba facility and inventories, and damage and restoration costs are expected to arise. The net loss cannot yet be reasonably estimated.
  13. FY2019-Q3MaterialisedAnnual report

    「Losses from disasters - 88」

    A loss of ¥88 million due to the disaster was recognized. Although the type of disaster is not specified in the text, disaster-related losses have been realized.
  14. FY2018RestatedAnnual report

    「In preparation for fires, earthquakes and large-scale natural disasters, the Group has taken measures necessary for business continuity, including formulating business continuity plans (BCPs) covering information systems, establishing communication systems, preparing disaster response manuals, introducing an employee safety confirmation system, and conducting daily inspections and drills.」

    The Company reiterates its response to natural disasters and other events through BCPs, manuals, employee safety confirmation and drills.
  15. FY2017RestatedAnnual report

    「In preparation for fires, earthquakes and large-scale natural disasters, the Group has taken measures necessary for business continuity, including formulating business continuity plans (BCPs) covering information systems, establishing communication systems, preparing disaster response manuals, introducing an employee safety confirmation system, and conducting daily inspections and drills. However, if such disasters cause serious damage to property and personnel, direct and indirect losses and restoration costs may be substantially higher than expected and adversely affect business performance and financial condition, despite appropriate insurance coverage.」

    The Company reiterates its response to natural disasters and other events through BCPs, drills and insurance, as well as the residual risks.
  16. FY2016First statedAnnual report

    「In preparation for fires, earthquakes and large-scale natural disasters, the Group has taken measures necessary for business continuity, including formulating business continuity plans (BCPs) covering information systems, establishing communication systems, preparing disaster response manuals, introducing an employee safety confirmation system, and conducting daily inspections and drills. However, if such disasters cause serious damage to property and personnel, direct and indirect losses and restoration costs may be substantially higher than expected and adversely affect business performance and financial condition, despite appropriate insurance coverage.」

    The Company describes disaster response measures involving BCPs, communication systems, manuals, employee safety confirmation, drills and insurance.
Moved together

"Risk of Large-Scale Project Cancellations, Delays and Deteriorating Profitability" moved the same way as this thread, in the same document, in 7 of its 16 moves.

766544★123456
  1. ★This thread
  2. 1Risk of Large-Scale Project Cancellations, Delays and Deteriorating Profitability7×
  3. 2Foreign Exchange Rate Risk6×
  4. 3Management of Risks from Changes in Credit, Liquidity, Interest Rates and Investment Securities Prices6×
  5. 4Improving the Profitability of Logistics Systems and Strengthening the Value Chain5×
  6. 5Growing Demand for Logistics Systems and Measures to Save Labor and Reduce Workforce Requirements4×
  7. 6Transition to a More Profitable Business Structure and Strengthening Competitiveness4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toyo Kanetsu K.K. yet. It last moved in the M&A and Subsidiary Changes of 2026-09-25: "Mitigated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Business continuity risks from natural disasters and other events | TOYO KANETSU K.K. (6369) | Komori