Suspension of Operations at the Kyushu Plant and Disaster Losses Resulting from the Kumamoto Earthquake
First written in FY2017-Q2. 3 of 4 entries say "Materialised", first in FY2017-Q2. Latest entry: 2026-08-03.
Rorze moved to the "Worse" side of this theme in 2026.
1 other company's latest entry also says "Materialised".
- FY2017-Q3RestatedAnnual report
「In addition, the Company recorded ¥58 million as an extraordinary loss from the Kumamoto Earthquake, which occurred in April 2016, consisting of emergency building repair work and disposal costs for inventories at its Kyushu Plant in Kōshi, Kumamoto Prefecture. Manufacturing operations at the site were temporarily suspended but resumed in June 2016.」
The Kyushu Plant's temporary suspension and disaster losses caused by the Kumamoto Earthquake, as well as the resumption of manufacturing in June 2016, continue to be disclosed. The cumulative disclosed disaster losses total ¥58 million. - FY2017-Q2MaterialisedAnnual report
「In addition, the Company recorded ¥57 million as an extraordinary loss from the Kumamoto Earthquake, which occurred in April 2016, consisting of emergency building repair work and disposal costs for inventories at its Kyushu Plant in Kōshi, Kumamoto Prefecture. Manufacturing operations at the site were temporarily suspended but resumed in June 2016.」
Manufacturing operations at the Kyushu Plant were temporarily suspended following the Kumamoto Earthquake, resulting in ¥57 million of disaster losses, including emergency building repair work and inventory disposal costs. Manufacturing operations resumed in June 2016.