Inclusion of the Hard Ground Clear Method in the Ministry of Land, Infrastructure, Transport and Tourism’s cost-estimation standards
First written in FY2025. 1 of 2 entries say "Cited as achieved", first in 2026-07-03. Latest entry: 2026-07-03.
No other company in this theme has enough history to compare yet.
- 2026-07-03Cited as achievedOther Disclosures
「In Japan, the method has earned such trust and established such a track record that it is listed in the Ministry of Land, Infrastructure, Transport and Tourism’s standard civil engineering construction cost estimation guidelines,」
硬質地盤クリア工法の国土交通省積算基準への掲載が、シンガポールでの工法・鋼材の優位性を説明する実績として引用された。 - FY2025First statedAnnual report
「The press-in installation of 900 mm-wide hat-shaped steel sheet piles into hard ground was newly included in the fiscal 2025 edition of the Ministry of Land, Infrastructure, Transport and Tourism's civil engineering construction cost estimation standards. This means the method has been officially recognized as a standard method for public works, and wider adoption is expected to accelerate.」
The press-in installation of 900 mm-wide hat-shaped steel sheet piles into hard ground was included in the Ministry of Land, Infrastructure, Transport and Tourism's civil engineering construction cost estimation standards, reaching the stage at which it is treated as a standard method for public works.