Risk of earnings volatility due to concentration of 2 key projects in the fourth quarter
First written in FY2016-Q3. 14 of 23 entries say "Materialised", first in FY2021-Q1. Latest entry: 2026-10-09.
Npc moved to the "Worse" side of this theme in 2018, 4 years before the typical company in this theme (2022).
The whole theme swung hardest in 2020: 10 of 32 companies on the "Worse" side.
4 other companies' latest entry also says "Materialised".
- FY2025-H1MaterialisedAnnual report
「Meanwhile, deliveries of FA equipment and solar panel dismantling equipment for overseas customers shifted into the second half due to delays in customers arranging sea freight, while delivery of solar panel dismantling equipment for domestic customers shifted into the second half because customers were late preparing to receive it.」
Regarding the risk of shifts in revenue recognition timing, deliveries of FA equipment and solar panel dismantling equipment actually shifted into the second half due to delays in arranging sea freight and customers' delayed preparations to receive the equipment. - FY2024MaterialisedAnnual report
「Some projects shifted into the fiscal year ending August 2025 due to the timing of acceptance inspections for on-site work.」
Due to the timing of acceptance inspections for on-site work, revenue recognition for some projects actually shifted into the following fiscal year. - FY2024-Q2MaterialisedAnnual report
「Although part of an overseas panel dismantling equipment project was postponed at the customer's request, revenue was recognized on 3 semi-automated solar panel dismantling machines, or frame removal machines, for a domestic industrial waste management company.」
It explained that part of an overseas project was actually postponed at the customer's request, affecting the timing of revenue recognition. - FY2023-Q2MaterialisedAnnual report
「Some project revenue shifted into the second half.」
Regarding the risk of earnings volatility from shifts in revenue recognition timing, the disclosure stated that revenue from some projects shifted into the second half in the second quarter. - FY2022MaterialisedAnnual report
「For an overseas panel dismantling equipment project, the timing of on-site acceptance was brought forward due to a delay in sea freight, and revenue recognition shifted to the next fiscal year, the fiscal year ending August 2023.」
A delay in revenue recognition caused by a mismatch in transportation and acceptance timing actually occurred on an overseas panel dismantling equipment project in the environmental business. - FY2022-Q2MaterialisedAnnual report
「Under these circumstances, revenue for the cumulative second quarter of the current consolidated fiscal year was ¥1,592 million, below the initial forecast, due to shifts in revenue recognition timing caused by extended lead times for parts and schedule changes to some on-site work projects because customer factories were operating at full capacity. This represented a year-on-year decrease of ¥4,200 million.」
Shifts in revenue recognition timing caused by extended parts lead times and schedule changes to on-site work projects due to customers' factories operating at full capacity actually occurred, resulting in revenue below the initial forecast. - FY2022-Q1MaterialisedAnnual report
「The timing of revenue recognition for some solar cell manufacturing equipment and FA equipment projects was postponed.」
The disclosure stated that the risk of postponed project revenue recognition actually materialized in the first quarter for some solar cell manufacturing equipment and FA equipment projects. - FY2021MaterialisedAnnual report
「In the equipment-related business, the group modified and expanded equipment for its major customer, a US solar cell manufacturer, and recognized revenue on solar cell manufacturing equipment for other US solar cell manufacturers. It also recognized revenue on FA equipment, mainly for domestic electronic component manufacturers, but due in part to customer-requested schedule changes on some overseas FA equipment projects, revenue was ¥4,905 million, a decrease of ¥2,579 million year on year, and slightly below plan.」
Customer-requested schedule changes actually occurred on overseas FA equipment projects, causing revenue from the equipment-related business to fall below plan. - FY2021-Q2MaterialisedAnnual report
「Meanwhile, the revenue recognition timing for some solar cell manufacturing equipment projects shifted into the second half, and revenue fell below the initial forecast.」
Regarding the risk of earnings volatility from shifts in revenue recognition timing, some solar cell manufacturing equipment projects actually shifted into the second half, resulting in revenue below the initial forecast. - FY2021-Q1MaterialisedAnnual report
「This was because expansions and modifications were carried out on existing lines at a US solar cell manufacturer, and sales of high-margin parts performed strongly, far exceeding the plan. Meanwhile, the timing of revenue recognition for some solar cell manufacturing equipment and FA equipment projects shifted between fiscal periods, and revenue fell below the initial forecast.」
The previously disclosed risk of shifts in project revenue recognition timing actually materialized for some solar cell manufacturing equipment and FA equipment projects, resulting in revenue below the initial forecast. - FY2020ReframedAnnual report
「Design changes or changes to the timing of acceptance inspections may occur at the customer's request, and the resulting postponement of the originally scheduled revenue recognition timing may affect short-term performance.」
The previous risk of volatility caused by the acceptance timing of large-scale projects was systematized as a short-term earnings volatility risk encompassing design changes, acceptance delays, development elements, product defects and cost overruns, and the possibility of large-scale projects exceeding ¥1 billion was also indicated. - FY2020-Q1ReframedAnnual report
「The company planned for performance to be weighted toward the second half of the fiscal year. Because the first quarter of the current consolidated fiscal year focused mainly on manufacturing large lines scheduled for revenue recognition in the second half, performance for the quarter was broadly in line with the initial plan.」
In addition to the previous explanation of earnings volatility caused by the acceptance timing of large-scale projects, the company provided more specific details on the planned seasonality of concentrating activity in the second half, including manufacturing a large-scale line in the first quarter. - FY2019ReframedAnnual report
「Transactions involving FA equipment in the equipment-related business are recognized under either a shipment basis or an acceptance basis, in accordance with the contractual terms with customers, but design changes or changes to the timing of acceptance inspections may occur at the customer's request. In the environmental business, the timing of revenue recognition may also shift from the originally scheduled period due to customer-related factors, weather and other influences, potentially affecting the performance of the group.」
The explanation expanded from the existing risks of design changes and acceptance timing changes in the equipment-related business to include shifts in revenue recognition timing caused by customer-related factors and weather in the environmental business. - FY2018SoftenedAnnual report
「Transactions involving the solar cell manufacturing equipment supplied by the group are recognized under either a shipment basis or an acceptance basis, in accordance with the contractual terms with customers. If design changes or changes to the timing of acceptance inspections occur at the customer's request, the timing of revenue recognition may shift from the originally scheduled period, potentially affecting the performance of the group.」
The previous explanation of the acceptance inspection period for large-scale projects and significant quarterly earnings volatility was removed, leaving a description focused on shipment and acceptance bases and customer-requested design and acceptance timing changes. - FY2017RestatedAnnual report
「Large, high-value integrated production lines and composite equipment require approximately 4–6 months before delivery and acceptance inspection. If the number of such projects increases, quarterly performance may fluctuate significantly depending on the timing of acceptance inspections. In addition, if design changes or changes to the timing of acceptance inspections occur at the customer's request, the timing of revenue recognition may shift from the originally scheduled period, potentially affecting the performance of the group.」
The disclosure reiterates the risk that the acceptance inspection period for large-scale projects and customer-requested changes to the timing of revenue recognition may affect quarterly performance. - FY2016ReframedAnnual report
「Large, high-value integrated production lines and composite equipment require approximately 4–6 months before delivery and acceptance inspection. If the number of such projects increases, quarterly performance may fluctuate significantly depending on the timing of acceptance inspections. In addition, if design changes or changes to the timing of acceptance inspections occur at the customer's request, the timing of revenue recognition may shift from the originally scheduled period, potentially affecting the performance of the group.」
The description broadened from 2 projects concentrated in the fourth quarter to the more general risk of revenue recognition timing, including the 4–6-month acceptance inspection period for integrated lines and composite equipment and customer-requested changes. - FY2016-Q3First statedAnnual report
「As 2 projects with a significant impact on the current fiscal year's revenue plan are concentrated in the fourth quarter, performance through the third quarter remained weak.」
It explained that projects with a significant impact on the revenue plan were concentrated in 2 projects, resulting in weak performance through the third quarter.