Komori
Techno Smart Corp. (6246) · InitiativeAdvanced

Improving Manufacturing Efficiency Through New Investment in Processing Machinery

First written in FY2017. 15 of 29 entries say "Restated". Latest entry: FY2026.

29entries
10years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2024 – FY20252017: 120172018: 420182019: 420192020: 420202021: 320212022: 320222023: 320232024: 320242025: 220252026: 22026
Same theme, other companies
Equipment Renewal to Reduce Labor Requirements and Improve Product ReliabilityA theme 22 companies write about · 0 as a headwind · 23 as a tailwind

9 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 22 companies compared. The sentences above are computed from all 22.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Total capital investment for the fiscal year was ¥474 million, primarily in machinery and equipment at the Shiga facility.」

    The company invested ¥474 million, primarily in machinery and equipment at the Shiga facility, as capital investment related to processing and production efficiency improvements.
  2. 2026-05-13AdvancedManagement plan

    「自動化を推進する設備の導入」

    製造効率化について、生産設備の自動化、省人化および自動溶接による製造工数削減が具体化された。
  3. FY2026-H1RestatedAnnual report

    「The start of operations at the new test machines at our Shiga facility is also expected to shorten the time required to produce samples with customers.」

    As a result of investment in processing and testing-related equipment, the new testing machinery began operating, and conditions were confirmed under which a reduction in sample production lead times is expected.
  4. FY2025AdvancedAnnual report

    「Total capital investment for the fiscal year was ¥909 million, primarily for a new laboratory building and new testing machinery at the Shiga facility.」

    The company made ¥909 million in capital investment, primarily in a new laboratory building and new testing machinery, fleshing out investment in processing and testing-related equipment.
  5. FY2025-H1AdvancedAnnual report

    「We are currently continuing work on the new construction of the experimental building and the new purchase of test machines and processing equipment, with operations scheduled to begin in April 2025. We aim to establish a framework capable of meeting customers' requests for advanced-technology testing, improve production efficiency, and further increase orders and sales.」

    Capital investment, including the purchase of new testing and processing machinery, progressed to the implementation stage, and plans to commence operations in April 2025 were fleshed out.
  6. FY2024AdvancedAnnual report

    「Total capital investment for the fiscal year was ¥283 million, primarily in structures, machinery and equipment, and tools, fixtures and equipment at the Shiga facility.」

    Capital investment in structures, machinery and equipment, and tools, fixtures and equipment at the Shiga facility progressed, bringing total capital investment for the fiscal year to ¥283 million.
  7. FY2024-Q3RestatedAnnual report

    「We are continuing work on the new construction of the experimental building and the new purchase of test machines and processing equipment, seeking to establish a framework capable of meeting customers' requests for advanced-technology testing, improve production efficiency, and further increase orders and sales.」

    The policy of pursuing capital investment, including the purchase of new processing machinery, to improve production efficiency and increase orders and sales was reaffirmed.
  8. FY2024-Q1AdvancedAnnual report

    「We are continuing work on the new construction of the experimental building and the new purchase of test machines and processing equipment, seeking to establish a framework capable of meeting customers' requests for advanced-technology testing, improve production efficiency, and further increase orders and sales.」

    It was stated that capital investment, including the purchase of new processing machinery, was at the implementation stage.
  9. FY2023AdvancedAnnual report

    「Going forward, we plan to begin new construction of the experimental building and purchase additional experimental equipment and processing machinery. We will establish a structure capable of meeting customers' requests for advanced technology testing, improve production efficiency, and aim to increase orders and sales further.」

    Plans were fleshed out for factory-related investment, including construction of a laboratory building and the purchase of testing and processing machinery, starting in fiscal 2023.
  10. FY2023-Q3RestatedAnnual report

    「Going forward, we plan to begin new construction of the experimental building and purchase additional experimental equipment and processing machinery. We will establish a structure capable of meeting customers' requests for advanced technology testing, improve production efficiency, and aim to increase orders and sales further.」

    The plan to improve production efficiency and increase orders and sales through capital investment, including the purchase of new testing and processing machinery, was reaffirmed.
  11. FY2023-Q2RestatedAnnual report

    「Going forward, we plan to begin new construction of the experimental building and purchase additional experimental equipment and processing machinery. We will establish a structure capable of meeting customers' requests for advanced technology testing, improve production efficiency, and aim to increase orders and sales further.」

    The plan to improve production efficiency and increase orders and sales through capital investment, including the purchase of new testing and processing machinery, was reaffirmed.
  12. FY2022AdvancedAnnual report

    「Going forward, we plan to begin new construction of the experimental building and purchase additional experimental equipment and processing machinery. We will establish a structure capable of meeting customers' requests for advanced technology testing, improve production efficiency, and aim to increase orders and sales further.」

    Plans to begin construction of a laboratory building following the plant renovation, along with the purchase of new testing and processing machinery, were fleshed out.
  13. FY2022-Q3RestatedAnnual report

    「Some of the renovation work planned at the end of the previous fiscal year, including earthquake-proofing and expansion work at the Shiga facility, was completed in June 2021. Plans for the pilot plant and test machines are being advanced sequentially. The production equipment will be considered in light of future business performance and other factors.」

    For factory- and machinery-related investment, the earthquake-proofing and expansion work was completed, plans for the pilot plant and test machines were advanced, and it was reaffirmed that new investment in production equipment remained under consideration.
  14. FY2022-Q2Progress on plans for the pilot plant and test machines, with production equipment remaining under considerationAnnual report

    「Some of the renovation work planned at the end of the previous fiscal year, including earthquake-proofing and expansion work at the Shiga facility, was completed in June 2021. Plans for the pilot plant and test machines are being advanced sequentially. The production equipment will be considered in light of future business performance and other factors.」

    For factory- and machinery-related investment, the earthquake-proofing and expansion work was completed, plans for the pilot plant and test machines were advanced, and new investment in production equipment was to be considered in light of business performance.
  15. FY2022-Q1AdvancedAnnual report

    「Some of the renovation work planned at the end of the previous fiscal year, including earthquake-proofing and expansion work at the Shiga facility, was completed in June 2021. Plans for the test machines are being advanced sequentially. The production equipment will be considered in light of future business performance and other factors.」

    Factory-related investment made concrete progress with completion of some renovation work, including earthquake-proofing and expansion work. Meanwhile, the test machines remain under an ongoing plan, and the production equipment remains under consideration.
  16. FY2021-Q3RestatedAnnual report

    「By allocating these funds to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The plan to allocate funds raised through share acquisition rights to the construction, expansion and renovation of the factory and the purchase and replacement of machinery and equipment, thereby increasing production capacity, was reaffirmed.
  17. FY2021-Q2RestatedAnnual report

    「By allocating these funds to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The allocation of funds to capital investment, including the purchase and replacement of machinery and equipment, and the plan to increase production capacity were reaffirmed.
  18. FY2021-Q1RestatedAnnual report

    「By allocating these funds to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The plan to allocate funds raised through share acquisition rights to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, thereby increasing production capacity, was reaffirmed.
  19. FY2020AdvancedAnnual report

    「We had been working to increase production capacity at the Shiga Factory, our main factory, but the factory had aged and become cramped. We therefore raised funds through the issuance and exercise of share acquisition rights from 2018 to 2019 to construct a new Shiga Factory and expand and renovate it in order to increase production capacity.」

    The factory reorganisation and machinery and equipment replacement plan was progressing concretely through ¥722 million in capital expenditure, construction of the main building at the Shiga Factory, and earthquake-proofing and expansion work.
  20. FY2020-Q3RestatedAnnual report

    「Total assets were ¥25,092 million, up 2.7% from the end of the previous fiscal year. This was mainly due to an increase in buildings.」

    The continuation of capital expenditure and factory-related investment involving an increase in buildings was reaffirmed.
  21. FY2020-Q2RestatedAnnual report

    「In addition, we had been working to expand production capacity at the Shiga Factory, our main factory, but addressing the factory's aging and expanding production space had become challenges. We therefore raised funds through the issuance and exercise of share acquisition rights through the previous fiscal year to earthquake-proof and expand or renovate the Shiga Factory and update machinery and equipment, thereby ensuring safety and increasing production capacity.」

    The plan to ensure safety and increase production capacity through earthquake-proofing, expansion and renovation of the Shiga Factory and replacement of machinery and equipment, together with funding raised through the previous fiscal year, was reaffirmed.
  22. FY2020-Q1RestatedAnnual report

    「To ensure safety and increase production capacity through seismic reinforcement and expansion and renovation of the Shiga plant and the renewal of machinery and equipment, we raised funds through the issuance and exercise of share acquisition rights by the end of the previous fiscal year.」

    The plan to ensure safety and increase production capacity through capital investment, including the replacement of machinery and equipment, was reaffirmed.
  23. FY2019AdvancedAnnual report

    「Aiming to increase production capacity through factory reorganisation and improve production efficiency through the introduction of new equipment」

    Improvements in production capacity through factory reorganisation and production efficiency through the introduction of new equipment continued to be identified as priorities, while ¥177 million was invested in capital expenditure during the fiscal year, mainly in the construction, expansion and renovation of the factory.
  24. FY2019-Q3RestatedAnnual report

    「By allocating the funds raised this time to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The plan to allocate the funds raised to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, thereby increasing production capacity, was reaffirmed.
  25. FY2019-Q2RestatedAnnual report

    「By allocating the funds raised this time to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The plan to allocate the funds raised to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, thereby increasing production capacity, was reaffirmed.
  26. FY2019-Q1RestatedAnnual report

    「By allocating the funds raised this time to the construction, expansion and renovation of the Shiga Factory and the purchase and replacement of machinery and equipment, production capacity is expected to increase.」

    The plan to allocate the funds raised to capital investment, including the purchase and replacement of machinery and equipment, thereby increasing production capacity, was reaffirmed.
  27. FY2018RestatedAnnual report

    「Shiga Factory (Yasu, Shiga Prefecture) Buildings Production equipment Test machines 2,000,000 Funds raised through the issuance and exercise of share acquisition rights February 2018 January 2021」

    The capital investment plan, including the purchase and replacement of machinery, production equipment and other assets, was reaffirmed as part of the total ¥2 billion plan related to the Shiga Factory.
  28. FY2018-Q3AdvancedAnnual report

    「② Costs of purchasing and replacing machinery and equipment 200 February 2018-January 2021」

    A plan was formalised to spend ¥200 million on the purchase and replacement of machinery and equipment from February 2018 through January 2021, using funds raised through share acquisition rights.
  29. FY2017First statedAnnual report

    「⑨ Manufacturing efficiency through new investment in processing machinery」

    The initiative to use new investment in processing machinery to improve manufacturing efficiency was explicitly presented for the first time as a business strategy.
Moved together

"Improving manufacturing process efficiency through the construction of a new plant and rebuilding the existing plant" moved the same way as this thread, in the same document, in 9 of its 29 moves.

988765★123456
  1. ★This thread
  2. 1Improving manufacturing process efficiency through the construction of a new plant and rebuilding the existing plant9×
  3. 2Profit Protection Through Process Efficiency, Outsourcing Management and Specification Standardization8×
  4. 3Joint Research and Development with Customers Using Permanently Installed Test Equipment8×
  5. 4Strengthening Orders for Optical Films, Secondary Batteries, Medical Materials, and Energy-Related Products7×
  6. 5Improving ROE through management reforms6×
  7. 6Expansion of export sales to rapidly growing emerging markets5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Techno Smart Corp. yet. It last moved in the Management plan of 2026-05-13: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Improving Manufacturing Efficiency Through New Investment in Processing Machinery | Techno Smart Corp. (6246) | Komori