Supply Chain Disruptions Caused by Semiconductor Shortages and China’s Zero-COVID Policy

First written in FY2022-Q3. 1 of 4 entries say "Materialised", first in FY2022. Latest entry: FY2023-Q3.

4entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022-Q3MaterialisedFY2022 – FY2023-Q22022: 220222023: 22023
Same theme, other companies
Impact of Chinese economic slowdown on raw materials and the supply chainA theme 11 companies write about · 12 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2022: 5 of 10 companies on the "Worse" side.

3 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2023-Q3MitigatedAnnual report

    「Following the lifting of China’s zero-COVID policy in December 2022, many employees of Nagaoka Setsubi (Dalian) Co., Ltd. contracted COVID-19, temporarily reducing the operating rate. Operations subsequently recovered, and production has proceeded without causing delivery delays.」

    The spread of infections following the lifting of China's zero-COVID policy temporarily reduced operations at the Dalian plant, but operations subsequently recovered and manufacturing is progressing without delivery delays.
  2. FY2023-Q2WorsenedAnnual report

    「Following the lifting of China's zero-COVID policy, many employees of 那賀設備(大連)有限公司 became infected, causing operations in December to decline significantly and affecting revenue recognized based on manufacturing progress.」

    In addition to the supply chain impact of the previous lockdowns and activity restrictions, the spread of infections after the policy was lifted caused operations at the Dalian plant to decline and affected manufacturing progress and revenue.
  3. FY2022MaterialisedAnnual report

    「In particular, disruption and stagnation in the supply chain caused by lockdowns in China delayed the delivery of materials, affecting the production activities of our group.」

    Lockdowns and activity restrictions under China's zero-COVID policy had a tangible impact on the supply chain, material deliveries and production activities.
  4. FY2022-Q3First statedAnnual report

    「During the third quarter of the current consolidated cumulative period, the Japanese economy was on a recovery trend as economic activity resumed in stages, but unstable conditions continued due to the semiconductor shortage, surging resource prices and other factors. In China, city lockdowns and tighter activity restrictions were implemented under the zero-COVID policy, significantly affecting supply chains.」

    It states that semiconductor shortages and lockdowns and activity restrictions in China have had a significant impact on the supply chain.
Moved together

"Energy-related business turns profitable through large projects, high capacity utilization and cost reductions" moved the same way as this thread, in the same document, in 3 of its 4 moves.

322★123
  1. ★This thread
  2. 1Energy-related business turns profitable through large projects, high capacity utilization and cost reductions3×
  3. 2Water-Related Business Segment Turns Profitable2×
  4. 3Impact of the Spread of COVID-19 on Business Activities2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Nagaoka International yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Supply Chain Disruptions Caused by Semiconductor Shortages and China’s Zero-COVID Policy | NAGAOKA INTERNATIONAL CORPORATION (6239) | Komori