Risk of Manufacturing Disruptions Caused by Scheduled Power Outages at a Chinese Subsidiary in Dalian
First written in FY2022-Q1. 1 of 2 entries say "Mitigated", first in FY2022-Q2. Latest entry: FY2022-Q2.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Impact of Electricity Supply Restrictions in China on ProductionA theme 7 companies write about · 7 as a headwind · 0 as a tailwind
The whole theme swung hardest in 2022: 3 of 6 companies on the "Worse" side.
1 other company's latest entry also says "Mitigated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2022-Q2MitigatedAnnual report
「The scheduled power outages in China were ultimately implemented for only a short period, and their impact remained minor.」
Regarding the risk of scheduled power outages at the Dalian subsidiary, it is stated that the outages ended after a short period and had only a minor impact. - FY2022-Q1First statedAnnual report
「In production, the Dalian subsidiary is manufacturing a large-scale project for China that was ordered in 2021. Scheduled power outages that began this summer have been implemented intermittently. Although the impact is limited at present, work has had to be suspended during the outages.」
Scheduled power outages actually occurred at the Dalian subsidiary, creating a new operating risk involving work stoppages during outages. The impact at present is described as limited.