Semiannual Report — FY2026 H1
What KIMURA KOHKI Co.,Ltd. reported for the period from 2026-04-01 to 2027-03-31.
Filed 2026-11-13View the original on EDINET
How much it says
61Detailed
What moved here
13named for the first time
Its own wording
17terms
Which filing this is
21/ 21newest
No officer data yetThis company's filings have not been read for officers yet. Nothing is missing from the filings — the roster simply has not been extracted.
The gist
During the interim accounting period, orders received and revenue progressed steadily, with revenue of ¥9,973.405 million, ordinary profit of ¥2,763.328 million and interim net income of ¥1,929.392 million. The filing also states that development of the water-cooled heat-pump dual air-conditioning system as a new product, development testing for new-refrigerant compatibility and advanced control systems, the start of operations at Kawage Technical Research Institute in October, and construction of a new factory building at Kawage Works progressed.
Komori's summary of this document, not the document's own words.61Detailed
How much this filing saysA weighted roll-up of 10 rubric dimensions, each scored from a fixed set of questions asked against this filing — built only from the 35 this document could answer. It measures how specific the disclosure is, not whether the company is doing well. Derived from the data, not editorial.
73
Detailed
68
Detailed
76
Very detailed
75
Very detailed
12
Almost nothing
55
Typical
62
Detailed
53
Typical
79
Very detailed
50
Typical
R&D spend2億円Money spent making new things.
Cash left over14億円Cash from the business, less what went into equipment.
Spent on equipment5億円Plants, machines — things meant to last.
EmployeesNot disclosedThis document does not carry the figure.
How to read this page
This is not the documentIt is Komori's reading of the filing submitted to EDINET. The original is linked above.
The score is not a verdictIt measures how specific the disclosure is. It says nothing about results or where the share price goes.
When it updatesContent lands once the filing has been read through. Right after submission, the summary can still be empty.