Core System Implementation
First written in FY2025-H1. 2 of 9 entries say "Advanced", first in FY2025. Latest entry: 2026-08-14.
OKUMURA ENGINEERING corp. moved to the "Worse" side of this theme in 2026, 4 years after the typical company in this theme (2022).
The whole theme swung hardest in 2021: 9 of 48 companies on the "Worse" side.
2 other companies' latest entry also says "Reframed".
- 2026-08-14ReframedEarnings presentation materials
「Following the review of the new core system implementation plan, expenses related to design and construction will also be incorporated.」
For the new core system, the disclosure stated that design and construction costs would be incorporated into the earnings forecast after the implementation plan was reviewed. - FY2026Plan revision, contract termination and impairmentAnnual report
「After comprehensively evaluating the progress of initiatives related to the introduction of the new core system and other factors and revising the plan, the Company recorded a contract termination loss of ¥98 million and an impairment loss of ¥68.012 million under extraordinary losses.」
The plan was reviewed based on a progress assessment, and the SaaS usage agreement was terminated. A contract termination loss of ¥98 million and an impairment loss of ¥68.012 million were recognized. - FY2026-H1AdvancedAnnual report
「Although communication expenses increased due to the transition to the new core system, operating income was ¥627.741 million, up 31.7% year on year, owing mainly to improved profitability of valves for LNG (liquefied natural gas) and overall expense controls.」
The transition to the new core system was underway, and higher communication expenses emerged in the interim period's results as an expense factor. - FY2025AdvancedAnnual report
「Head office and R&D Center (Yasu, Shiga Prefecture) Core system 300,000 16,486 Internal funds and borrowings October 2024 May 2026」
For the core system plan, the Company disclosed ¥16.486 million as the amount already paid out of the total ¥300 million, and the plan, which began in October 2024 and is scheduled for completion in May 2026, is underway. The Board of Directors also considered entering into a contract to build an order management and production management system using an integrated core business system. - FY2025-H1First statedAnnual report
「Head office and R&D Center (Yasu, Shiga Prefecture) Core system Total planned investment: ¥300 million Funding: internal funds and borrowings Start date: October 2024 Scheduled completion: May 2026」
The Company has newly disclosed a ¥300 million total investment plan for its core system. The project is scheduled to begin in October 2024 and be completed in May 2026, funded by internal funds and borrowings.