Risk of production facility shutdowns due to large-scale disasters
First written in FY2023. 1 of 3 entries say "Restated". Latest entry: FY2025.
The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.
- FY2025ReframedAnnual report
「Both of the group’s production sites, the head-office plant and the Moriya satellite plant, are located in Ibaraki prefecture.」
The description of the production sites changed from stating that they were located in Ibaraki and Kanagawa prefectures to stating that both sites are located in Ibaraki prefecture. - FY2024RestatedAnnual report
「If a major disaster occurs in Ibaraki or Kanagawa prefecture, production equipment could be damaged and logistics functions disrupted, potentially causing production sites to cease operations and seriously affecting the company’s production system.」
The risk of production stoppages caused by major disasters at production sites in Ibaraki and Kanagawa prefectures continues to be disclosed. - FY2023First statedAnnual report
「If a major disaster occurs in Ibaraki or Kanagawa prefecture, production equipment could be damaged and logistics functions disrupted, potentially causing production sites to cease operations and seriously affecting the company’s production system.」
Major disasters affecting production sites in Ibaraki and Kanagawa prefectures were identified as a risk that could lead to equipment damage, logistics disruptions, and suspension of operations.