Komori
Nittoku (6145) · InitiativeAdvanced

Expanding production capacity through people, partnerships and standardization

First written in FY2018-Q1. 14 of 19 entries say "Advanced", first in FY2018-Q2. Latest entry: 2026-10-28.

19entries
10years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2020-Q2 – FY2022AdvancedFY2023 – 2026-10-282017: 220172018: 420182019: 320192020: 220202021: 120212022: 220222023: 220232024: 120242025: 120252026: 12026
Same theme, other companies
Increasing production capacity through expanded personnel and partners and through standardizationA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-10-28AdvancedM&A and Subsidiary Changes

    「当社は、2024 年5月 17 日付「愛媛事業所(仮称)の新設に関するお知らせ」にて公表した内容について、今般、愛媛事業所(北方)に係る工事請負契約を締結するとともに、一部変更および具体化した事項がありますので、下記のとおりお知らせいたします。」

    愛媛事業所の新設計画が、工事請負契約の締結、投資予定額約26億円、引渡予定日2027年9月、操業開始時期2027年10月として具体化した。事業内容もデータセンターおよびフィジカルAI等の部品製造向け自動化設備・一貫生産ラインへ見直されている。
  2. FY2025AdvancedAnnual report

    「During the fiscal year, we made total capital investments of ¥1,092 million, primarily for establishing the Ehime site and developing processing machines aimed at increasing production capacity.」

    Measures to expand production capacity have progressed to the establishment of the Ehime site and development of processing machines, with ¥1,092 million invested in the Winding Systems & Mechatronics business.
  3. FY2024AdvancedAnnual report

    「Specifically, in addition to the Shikoku Technical Center opened in 2018, we opened the Tottori Technical Center in May this year and the Shiga Technical Center in June this year, and are also promoting expansion into other areas. In addition, the Shikoku Technical Center will begin full-scale operations in 2026 as a site with manufacturing functions.」

    As measures to expand production capacity and secure personnel, the company established new Tottori and Shiga Technical Centers and presented plans for the Shikoku Technical Center to begin full-scale operations in 2026 as a site with manufacturing functions.
  4. FY2023AdvancedAnnual report

    「We will standardize modules and components and optimize production processes to shorten lead times and expand profits.」

    Measures to improve production capacity and productivity have been made specific through shorter lead times achieved by standardizing modules and components and optimizing processes.
  5. FY2023-Q3RestatedAnnual report

    「Because this involves acting on behalf of users in their production engineering, the company must respond swiftly to the needs and wants continually generated by each user in pursuit of sustainable growth, as well as to overseas expansion. Through the “Blue Lake Strategy,” which promotes collaboration and co-creation with users and suppliers through open innovation, the company advanced the deepening of its existing business areas and the exploration of adjacent business areas.」

    The company continues to pursue collaboration and co-creation with users and suppliers and explore adjacent areas through the Blue Lake Strategy.
  6. FY2023-Q2RestatedAnnual report

    「We responded rapidly to the customer needs successively created by the Blue Lake Strategy, which promotes collaboration and co-creation with customers and suppliers through open innovation, while deepening existing business areas and exploring adjacent areas.」

    The company continues to strengthen its production system by deepening existing business areas and exploring adjacent areas through collaboration and co-creation with customers and suppliers.
  7. FY2022AdvancedAnnual report

    「During the fiscal year, we made total capital investments of ¥521 million, primarily for the development of prototype and processing machines aimed at increasing production capacity.」

    The company invested ¥521 million to expand production capacity, mainly in the development of prototype and processing machines.
  8. FY2021AdvancedAnnual report

    「During the fiscal year, we made total capital investments of ¥617 million, mainly for the construction of a new plant for 日特機械工程(蘇州)有限公司 (China), with the aim of expanding production capacity.」

    The company invested ¥617 million as a measure to expand production capacity, mainly in establishing a new Suzhou plant. Strengthening the production system through a combination of personnel, partners and sites has progressed to the establishment of a new overseas site.
  9. FY2020AdvancedAnnual report

    「During the fiscal year, we made total capital investments of ¥1,953 million, primarily for the expansion of the Fukushima site aimed at increasing production capacity.」

    The company made ¥1,953 million in capital investments to expand production capacity, mainly through the expansion of the Fukushima site.
  10. FY2020-Q3AdvancedAnnual report

    「Property, plant and equipment increased by ¥2,680 million from the end of the previous consolidated fiscal year to ¥13,485 million. This was mainly attributable to increases of ¥1,432 million in buildings and structures (net) and ¥843 million in land.」

    Property, plant and equipment increased by ¥2,680 million from the end of the previous fiscal year, driven by increases in buildings, structures and land, indicating numerical progress in developing the physical infrastructure of the production and research and development sites.
  11. FY2020-Q2AdvancedAnnual report

    「This was mainly attributable to increases of ¥960 million in construction in progress included in Other (net) and ¥391 million in buildings and structures (net).」

    The increases in construction in progress and buildings and structures at the end of the second quarter show, in financial terms, progress in developing the physical infrastructure of the company’s sites and production base.
  12. FY2019RestatedAnnual report

    「During the fiscal year, we made total capital investments of ¥1,501 million, primarily for expansions of the Nagasaki and Fukushima sites aimed at increasing production capacity.」

    The company continues to make capital investments to expand production capacity, mainly through expansions of the Nagasaki and Fukushima sites.
  13. FY2019-Q3AdvancedAnnual report

    「As previously disclosed, we are proceeding with the relocation of the head office, including the expansion of its research and development functions, scheduled for August this year, the expansion of the Fukushima plant, scheduled for completion in November this year, and the expansion of the Nagasaki plant, completed in December last year.」

    The expansion of the Nagasaki plant has been completed, and the company has provided specific schedules of November this year for the Fukushima site and August this year for the head-office relocation as it works to expand its sites and production capacity.
  14. FY2019-Q2AdvancedAnnual report

    「The property was handed over on 23 October 2018.」

    Following the completion of the property handover for the expansion of the Fukushima and Nagasaki sites and the acquisition of property for relocating the head office and establishing research and development functions, the company has set out specific plans to strengthen its bases, human resources, design and development capabilities, and productivity.
  15. FY2019-Q1RestatedAnnual report

    「In this environment, our group has positioned itself upstream of these manufacturers, investing management resources in the development and manufacture of customized production-line equipment as a core business, while pursuing strategies centered on global human capital development, stronger business partnerships and stronger alliances focused on open innovation.」

    The company continues to pursue global talent development, expansion of business partners and stronger alliances as means of developing its production line business.
  16. FY2018AdvancedAnnual report

    「The key short-term challenge for our group is to expand production capacity. In particular, the increasing need for integrated FA lines is requiring more space. As disclosed on 29 November 2017, with partial revisions on 30 March 2018, we have begun expanding the Fukushima and Nagasaki sites, but we expect their contribution to business performance following the start of operations to begin in the fiscal year ending March 2020. Securing personnel is also a challenge, and in addition to actively recruiting new graduates and experienced hires, we plan to develop satellite locations such as the Shikoku Technical Center disclosed on 19 January 2018.」

    The company is proceeding with expansions of the Fukushima and Nagasaki sites, explaining that their contribution to business performance will begin in the fiscal year ending March 2020, while also indicating plans for graduate and experienced hiring and satellite locations modeled on the Shikoku Technical Center.
  17. FY2018-Q3AdvancedAnnual report

    「As the benefits of expanding the Fukushima and Nagasaki plants will not materialize until next year or later, we are currently strengthening our production structure by expanding overseas production, centered on 日特蘇州社, standardizing and streamlining designs and components, and strengthening our business partners.」

    As measures to expand production capacity, the company is specifically advancing overseas production, the commonization and rationalization of designs and components, and the expansion of business partners. The effects of expanding the Fukushima and Nagasaki plants are expected from next year onward.
  18. FY2018-Q2AdvancedAnnual report

    「Specifically, because the manufacture of our core FA equipment depends on manpower rather than equipment, we are actively strengthening and training personnel for both production and research and development in Japan and overseas. We are also energetically pursuing the expansion of factory buildings, strengthening of business partners and alliances.」

    In addition to securing and developing personnel, the company is pursuing the expansion of factory buildings and the strengthening of business partners and alliances as specific measures to expand production capacity.
  19. FY2018-Q1First statedAnnual report

    「This technology and expertise are based on a people-centered production system accumulated over many years, and we are currently working diligently on measures including securing and developing personnel, expanding our business partners and suppliers, and standardizing and commonizing designs and components.」

    The company has for the first time set out specific measures to address rising orders, advancing in parallel with the securing and development of personnel, expansion of partners and suppliers, and standardization and commonization of designs and components.
Moved together

"Expansion into Factory Automation and Globalisation" moved the same way as this thread, in the same document, in 7 of its 19 moves.

766666★123456
  1. ★This thread
  2. 1Expansion into Factory Automation and Globalisation7×
  3. 2Expanding Winding Machine Market Share and Expanding into Non-Winding Equipment6×
  4. 3Automation and Integrated Production-Line Equipment for Small, Precision, High-Quality Devices6×
  5. 4Orders Near the Production Capacity Limit and Order Backlog6×
  6. 5Overseas Microfactories and Capacity Expansion at Overseas Sites6×
  7. 6Continued R&D in Original Technologies6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Nittoku yet. It last moved in the M&A and Subsidiary Changes of 2026-10-28: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.