Komori
Eri Holdings (6083) · InitiativeAdvanced

Preparing for Full Mandatory Compliance with Energy-Efficiency Standards and the Curtailment of the No. 4 Exemption

First written in FY2022. 4 of 8 entries say "Advanced", first in FY2025. Latest entry: FY2026.

8entries
5years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2022 – FY2025-H1AdvancedFY2025 – FY20262022: 220222023: 120232024: 120242025: 220252026: 22026
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「(Building confirmation and inspection and housing performance evaluation businesses) Due to an increase in building confirmation and inspection services and energy-efficiency compliance determination services resulting from legal amendments, as well as fee revisions, net sales increased 25.3% year on year to ¥18,792 million, and operating profit increased 169.0% to ¥4,289 million.」

    In the core business, including the response to full mandatory compliance with energy efficiency standards and the narrowing of the Category 4 exemption, the increase in work resulting from legal amendments was reflected in a 25.3% increase in net sales and a 169.0% increase in operating profit.
  2. 2026-03-30AdvancedEarnings presentation

    「Nearly one year has passed since the amended law came into force in April 2025, but delays in building confirmation reviews have still not been resolved in the market. As the largest group of designated building confirmation and inspection bodies, we will work to eliminate backlogs in applications to facilitate the smooth start of new construction while also seeking to expand our business.」

    The company described continuing delays in building confirmation reviews after the amended law took effect and specified a policy of simultaneously eliminating application backlogs and expanding the business.
  3. FY2026-H1AdvancedAnnual report

    「In the Core Business, the number of certificates issued for energy-efficiency compliance assessments and housing performance evaluations increased after compliance with energy-efficiency standards became mandatory for all new buildings, including housing, from April.」

    Full mandatory compliance with energy efficiency standards entered the implementation phase in April 2025, and the increase in workload has become apparent in the number of energy-efficiency compliance determinations and housing performance evaluations issued.
  4. FY2025AdvancedAnnual report

    「In April 2025, a major revision of the Building Standards Act took effect, introducing full mandatory compliance with energy efficiency standards and substantially narrowing the scope of the Category 4 exemption, which had generally applied to newly built detached houses. Concerns have been voiced that the increased burden of application procedures and longer review times will lead to a backlog of reviews at designated building confirmation and inspection bodies.」

    Full mandatory compliance with energy efficiency standards and the narrowing of the Category 4 exemption took effect in April 2025. The Company is seeking to demonstrate the results of its preparations for the legal amendments and prevent a backlog of reviews.
  5. FY2025-H1RestatedAnnual report

    「In the Core Business, while developing the framework for energy-efficiency-related operations required to implement policies aimed at achieving a decarbonized society, the company acquired the shares of 株式会社福田水文センター and 国土工営コンサルタンツ株式会社 in June 2024 and made them subsidiaries to expand its business domains in the infrastructure and stock fields.」

    The Company continues to prepare its structure for energy-efficiency-related services aimed at achieving a decarbonized society.
  6. FY2024-Q2RestatedAnnual report

    「In its core business, the Company is developing systems for energy-saving services required to implement policies aimed at achieving a decarbonized society. To expand its business domains in the infrastructure stock sector, it acquired shares in アジアコンサルタント株式会社 in October 2023 and made it a subsidiary.」

    The Company continues to prepare its structure for energy-efficiency-related services aimed at achieving a decarbonized society, while making アジアコンサルタント株式会社 a subsidiary as a measure to expand its infrastructure and existing-assets businesses.
  7. FY2023-Q1RestatedAnnual report

    「In our core business, we are preparing the structure for energy-efficiency-related services required to implement policies aimed at achieving a decarbonized society, while」

    The Company continues to prepare its structure for energy-efficiency-related services in anticipation of full mandatory compliance with energy efficiency standards and other measures, under the medium-term management plan for the fiscal year ending May 2023.
  8. FY2022First statedAnnual report

    「Against this backdrop, with full mandatory compliance with energy efficiency standards scheduled for fiscal 2025, moves to obtain energy-efficiency performance ratings for housing and buildings, particularly among major operators, are expected to accelerate. The revision of the Building Standards Act will also substantially narrow the scope of the Category 4 exemption, which has previously applied to a very large number of detached houses and exempts them from structural review. We recognize that the technical capabilities to respond reliably to these regulatory reforms are the source of our Group's competitiveness. Given the expected increase in workload associated with this series of regulatory reforms, we believe that our Group must take the lead in preparing its organizational systems.」

    The Company has identified the preparation of its technical capabilities and operating structure ahead of the increase in workload accompanying regulatory reform as a key theme, in anticipation of full mandatory compliance with energy efficiency standards in fiscal 2025 and the narrowing of the Category 4 exemption.
Moved together

"Development of existing buildings and building stock-related services into a core business" moved the same way as this thread, in the same document, in 4 of its 8 moves.

443333★123456
  1. ★This thread
  2. 1Development of existing buildings and building stock-related services into a core business4×
  3. 2Acquisition of an Architectural Software Company to Strengthen ICT and Improve Operating Efficiency4×
  4. 3Strengthening the Profitability of Existing Core Businesses3×
  5. 4Expansion of Energy-Saving-Related Operations3×
  6. 5Entry into the Infrastructure-Stock Sector3×
  7. 6Revenue Growth and Significant Profit Growth in Consolidated Results3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Eri Holdings yet. It last moved in the Earnings presentation of 2026-03-30: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Preparing for Full Mandatory Compliance with Energy-Efficiency Standards and the Curtailment of the No. 4 Exemption | ERI HOLDINGS CO.,LTD. (6083) | Komori