Komori
Japan Animal Referral Medical Center (6039) · RiskWorsenedLatest Earnings presentation materials (2026-11-16): "Mitigated"

Utilization and investment recovery risks associated with facility expansion and capital investment

First written in FY2016. 17 of 22 entries say "Worsened", first in FY2017. Latest entry: 2026-11-16.

22entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseWorsenedFY2017 – FY2018WorsenedFY2022-Q3 – 2026-08-142016: 120162017: 120172018: 220182019: 120192020: 120202021: 220212022: 220222023: 420232024: 320242025: 120252026: 42026
Same theme, other companies
Profitability Deterioration from Delayed Recovery of New Care Facility InvestmentsA theme 6 companies write about · 6 as a headwind · 0 as a tailwind

Japan Animal Referral Medical Center moved to the "Worse" side of this theme in 2017.

2 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026WorsenedAnnual report

    「In recent years, construction costs have surged due to factors including higher prices for construction materials and labor costs, while labor shortages in the construction industry have tended to extend construction periods. As a result, investment in opening new facilities may exceed the initial plan, or the opening of a facility may be delayed.」

    Risks associated with facility expansion have been further specified, including higher construction costs, labor shortages in the construction industry, and increased investment or opening delays due to extended construction periods. Capital expenditure exposure is also expanding through the acquisition of land for Fukuoka Hospital and other investments.
  2. FY2026-H1WorsenedAnnual report

    「The company resolved to acquire fixed assets for the opening of Fukuoka Hospital (provisional name) and entered into a real estate purchase and sale agreement for the acquisition of those fixed assets on 24 June 2025. … Acquisition price: Not disclosed under a confidentiality agreement (equivalent to at least 30% of the group's consolidated net assets)」

    The company entered into an agreement to acquire land for Fukuoka Hospital, creating a large fixed-asset exposure with an acquisition price equivalent to at least 30% of consolidated net assets. Exposure to investment risks related to post-opening utilization, investment recovery and delays to the plan is expanding.
  3. FY2025-H1WorsenedAnnual report

    「Property, plant and equipment totaled ¥7,146.224 million, an increase of ¥153.551 million from the end of the previous consolidated fiscal year. This was mainly due to increases in buildings and structures associated with the opening of the radiation therapy wing at Osaka Hospital, partly offset by a decrease in construction in progress.」

    Buildings and structures increased with the opening of the radiation therapy wing at Osaka Hospital, and property, plant and equipment rose by ¥153.551 million from the end of the previous fiscal year. Asset exposure associated with facility expansion and capital expenditures is expanding.
  4. FY2024WorsenedAnnual report

    「During the consolidated fiscal year, total capital expenditures by the group amounted to ¥1,213.25 million. The main expenditures were for construction of Osaka Hospital and the purchase of medical equipment, the purchase of medical equipment for the Kawasaki Main Hospital, and the purchase of rental assets by subsidiary テルコム株式会社.」

    Total capital expenditures amounted to ¥1,213.25 million. As asset investments progressed at Osaka Hospital, the Kawasaki Main Hospital and テルコム, exposure related to facility utilization and investment recovery expanded.
  5. FY2024-Q3WorsenedAnnual report

    「Property, plant and equipment totaled ¥6,611.696 million, an increase of ¥429.522 million from the end of the previous consolidated fiscal year. This was mainly attributable to the opening of the Osaka hospital and the acquisition of tools, equipment and fixtures associated with the replacement of radiation therapy equipment at the Kawasaki main hospital.」

    Property, plant and equipment increased through the opening of Osaka Hospital and the replacement of radiation therapy equipment at the Kawasaki Main Hospital, expanding asset exposure related to utilization and investment recovery associated with facility expansion and capital expenditures.
  6. FY2024-Q2WorsenedAnnual report

    「Property, plant and equipment totaled ¥6,560.306 million, an increase of ¥378.132 million from the end of the previous consolidated fiscal year. This was mainly attributable to the opening of the Osaka hospital and the acquisition of tools, equipment and fixtures for the Kawasaki main hospital.」

    Property, plant and equipment increased through the opening of Osaka Hospital and the acquisition of equipment, expanding asset exposure related to facility utilization and investment recovery.
  7. FY2024-Q1WorsenedAnnual report

    「Property, plant and equipment totaled ¥6,306.809 million, an increase of ¥124.635 million from the end of the previous consolidated fiscal year. This was mainly due to the acquisition of tools, furniture and fixtures in connection with the opening of Osaka Hospital. In preparation for future business expansion, the company prepared for construction of a radiation therapy facility at Osaka Hospital and selected a property for a new hospital that will become its fifth secondary-care facility.」

    Property, plant and equipment increased by ¥124.635 million due to the acquisition of equipment associated with the opening of Osaka Hospital. Preparations for construction of a radiation therapy facility and property selection for the fifth hospital also progressed, expanding asset exposure related to facility expansion and capital expenditures.
  8. FY2023WorsenedAnnual report

    「During the consolidated fiscal year, total capital expenditures by the group amounted to ¥966.587 million. The main expenditures were for construction of Osaka Hospital and the purchase of medical equipment.」

    Total capital expenditures of ¥966.587 million were recorded, mainly for construction of Osaka Hospital and the purchase of medical equipment, expanding asset exposure associated with facility expansion and capital expenditures.
  9. FY2023-Q3WorsenedAnnual report

    「Property, plant and equipment totaled ¥5,731.5 million, an increase of ¥163.68 million from the end of the previous consolidated fiscal year. This was mainly due to increases of ¥239.009 million in construction in progress and ¥119.575 million in tools, furniture and fixtures, partly offset by a ¥176.078 million increase in accumulated depreciation.」

    Property, plant and equipment increased due to higher construction in progress and tools, furniture and fixtures, expanding asset exposure related to utilization and investment recovery associated with facility expansion and capital expenditures.
  10. FY2022WorsenedAnnual report

    「The fixed assets acquired in connection with the opening of Osaka Hospital are not considered idle assets for which the future use of the asset or asset group has not been determined, based on the new hospital opening plan. The planned opening date, a key assumption, involves estimation uncertainty. If the company determines that there are indications of impairment due to cancellation of the plan, significant delays or other factors, an impairment loss may be recognized in the consolidated financial statements for the following consolidated fiscal year.」

    The company recorded ¥667.891 million in land and ¥285.341 million in construction in progress for Osaka Hospital, and explicitly identified impairment risk based on the planned opening date as a key assumption. It states that impairment losses may arise if the plan is cancelled or significantly delayed.
  11. FY2022-Q3WorsenedAnnual report

    「Planned investment: ¥683 million Funding plan: Funded through internal funds, borrowings and other sources Construction start: January 2022 Completion: February 2023 (planned)」

    The company resolved to acquire fixed assets for the construction of Osaka Hospital (provisional name), with a planned investment of ¥683 million, and disclosed funding through internal funds, borrowings and other sources, as well as the planned construction start and completion dates. Exposure related to the facility investment, utilization and investment recovery is becoming more concrete.
  12. FY2021SoftenedAnnual report

    「Regarding Osaka Hospital, as part of the preparations, we plan to increase the number of veterinarians, veterinary nurses and other personnel providing care. … Construction is scheduled to begin in November 2021, and the planned opening is being postponed to November 2022.」

    The start of construction and opening of Osaka Hospital have been postponed again, and the company has also disclosed impairment risk based on the planned opening date as a key assumption, in addition to the utilization and investment recovery risks associated with the facility investment.
  13. FY2021-Q3Further postponement of the start of construction and opening of Osaka HospitalAnnual report

    「Preparations are under way for the provisionally named Osaka Hospital, including securing and training personnel to operate the hospital. However, as uncertainty over the outlook for economic activity continued amid concerns about the prolonged spread of COVID-19, the company carefully assessed the timing of construction commencement from a risk-management perspective. Based on the outlook that the spread of COVID-19 would gradually subside from April 2021, the company aimed to begin construction at an early date. The planned opening was postponed to spring 2022.」

    In light of concerns over the prolonged spread of COVID-19 and uncertainty regarding the outlook for economic activity, we carefully assessed the timing of construction and further postponed the planned opening of Osaka Hospital to spring 2022.
  14. FY2020WorsenedAnnual report

    「Regarding Osaka Hospital (provisional name), we will continue preparations aimed at opening around autumn 2021, including plans to increase the number of veterinarians, veterinary nurses and other personnel providing care.」

    Preparations for the opening of Osaka Hospital are continuing, with ¥709.873 million in capital expenditures shown as already paid, while the facility investment exposure related to post-opening utilization and investment recovery is also becoming more concrete.
  15. FY2019Postponement of the Opening of Osaka HospitalAnnual report

    「Because it was necessary to prioritize strengthening the staffing of the existing 3 hospitals, the opening of Osaka Hospital (provisional name), which is currently under preparation, was postponed to around autumn 2021.」

    The opening of Osaka Hospital was postponed in order to prioritize strengthening staffing at the existing 3 hospitals.
  16. FY2018WorsenedAnnual report

    「During the current consolidated fiscal year, our group's total capital investment was ¥787.727 million, mainly comprising construction costs for the Tokyo Hospital building and purchases of medical equipment.」

    Investment in the Tokyo Hospital building and medical equipment was made in connection with its opening, expanding the fixed-asset exposure associated with facility utilization and investment recovery.
  17. FY2018-Q3WorsenedAnnual report

    「Property, plant and equipment totaled ¥4,757.388 million, an increase of ¥733.513 million from the end of the previous consolidated fiscal year. This was mainly due to a ¥644.430 million increase in tangible fixed assets from building construction costs for Tokyo Hospital and purchases of medical equipment, as well as a ¥90.652 million increase in investments and other assets from the issuance of restricted shares and other activities.」

    Investment in fixed assets increased due to construction of the Tokyo Hospital building and purchases of medical equipment, expanding the asset exposure associated with facility utilization and investment recovery.
  18. FY2017WorsenedAnnual report

    「Our group plans to actively expand its facilities, including branch hospitals, throughout Japan.」

    The company has outlined plans to actively expand facilities nationwide, indicating that the scope of investments subject to facility-utilization and investment-recovery risks is set to broaden.
  19. FY2016First statedAnnual report

    「If customer and case numbers fall below expectations after new facilities are established or capital investments are made, utilization rates will decline, and the resulting increase in expenses such as depreciation may not be absorbed, potentially affecting our group's business development and performance.」

    The company also indicates that new facilities take time to exceed the break-even point and may operate at a loss after opening.
Moved together

"High Dependence on Interest-Bearing Debt and Interest Rate and Refinancing Risks" moved the same way as this thread, in the same document, in 8 of its 22 moves.

854332★123456
  1. ★This thread
  2. 1High Dependence on Interest-Bearing Debt and Interest Rate and Refinancing Risks8×
  3. 2Dilution of Share Value from Stock Options5×
  4. 3Expansion of secondary-care facilities in major cities nationwide4×
  5. 4A business mission centered on advanced medical care (secondary care)3×
  6. 5Intensifying Competition in the Animal Healthcare Industry3×
  7. 6Peripheral Services Related to Veterinary Medicine and Development of an Integrated Platform2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Japan Animal Referral Medical Center yet. It last moved in the Earnings presentation materials of 2026-11-16: "Mitigated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.