ProgressHeldSoftenedWorseFirst statedFY2017-Q2 – FY2017-Q3AdvancedFY2017 – FY2018-Q12016: 120162017: 32017
Same theme, other companies
New Production Equipment at the Matsudo No. 2 PlantA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2018-Q1AchievedAnnual report

    「During the three-month cumulative consolidated period, new equipment with a total acquisition cost of ¥361 million was installed at the Matsudo No. 2 Plant.」

    The company stated that new equipment with a total acquisition cost of ¥361 million had been installed at the Matsudo No. 2 Plant.
  2. FY2017AdvancedAnnual report

    「IWABUCHI CORPORATION, Matsudo No. 2 Plant, Matsudo, Chiba, traffic signals, signs and school sports facilities, broadband and disaster-prevention radio systems, information and telecommunications and telephone systems, power distribution lines, other manufacturing operations, production equipment, ¥385 million, borrowings, October 2016, June 2017, slight increase」

    For the production equipment plan at the Matsudo No. 2 Plant, the company disclosed ¥10.085 million in payments made to date and a planned completion date of June 2017, indicating specific progress and an update to the plan from the previous expected completion date. However, this filing does not state that the project had been completed.
  3. FY2017-Q3RestatedAnnual report

    「IWABUCHI CORPORATION, Matsudo No. 2 Plant, Matsudo, Chiba, traffic signals, signs and school sports facilities, broadband and disaster-prevention radio systems, information and telecommunications and telephone systems, power distribution lines, other manufacturing operations, production equipment, ¥385 million, borrowings, October 2016, September 2017, slight increase」

    The company continued to disclose its plan to install production equipment at the Matsudo No. 2 Plant, with a planned total investment of ¥385 million funded through borrowings, scheduled completion in September 2017, and a slight expected increase in capacity after completion.
  4. FY2017-Q2First statedAnnual report

    「During the six-month cumulative consolidated period, the following newly confirmed major capital investment plan was established: Company: IWABUCHI CORPORATION, Matsudo No. 2 Plant; Location: Matsudo, Chiba; Equipment: production equipment; Planned investment: ¥385 million in total; Funding: borrowings; Start: October 2016; Completion: September 2017; Increase in capacity after completion: slight.」

    A new plan was finalized to install production equipment at the Matsudo No. 2 Plant. The planned total investment is ¥385 million, funded through borrowings, with work scheduled to begin in October 2016 and be completed in September 2017. The resulting increase in capacity is expected to be slight.
Moved together

"Decline in Broadband Property Count and Fall in Market Prices" moved the same way as this thread, in the same document, in 2 of its 4 moves.

2★1
  1. ★This thread
  2. 1Decline in Broadband Property Count and Fall in Market Prices2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Iwabuchi yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
New Production Equipment at the Matsudo No. 2 Plant | IWABUCHI CORPORATION (5983) | Komori