- FY2018-Q1AchievedAnnual report
「During the three-month cumulative consolidated period, new equipment with a total acquisition cost of ¥361 million was installed at the Matsudo No. 2 Plant.」
The company stated that new equipment with a total acquisition cost of ¥361 million had been installed at the Matsudo No. 2 Plant. - FY2017AdvancedAnnual report
「IWABUCHI CORPORATION, Matsudo No. 2 Plant, Matsudo, Chiba, traffic signals, signs and school sports facilities, broadband and disaster-prevention radio systems, information and telecommunications and telephone systems, power distribution lines, other manufacturing operations, production equipment, ¥385 million, borrowings, October 2016, June 2017, slight increase」
For the production equipment plan at the Matsudo No. 2 Plant, the company disclosed ¥10.085 million in payments made to date and a planned completion date of June 2017, indicating specific progress and an update to the plan from the previous expected completion date. However, this filing does not state that the project had been completed. - FY2017-Q3RestatedAnnual report
「IWABUCHI CORPORATION, Matsudo No. 2 Plant, Matsudo, Chiba, traffic signals, signs and school sports facilities, broadband and disaster-prevention radio systems, information and telecommunications and telephone systems, power distribution lines, other manufacturing operations, production equipment, ¥385 million, borrowings, October 2016, September 2017, slight increase」
The company continued to disclose its plan to install production equipment at the Matsudo No. 2 Plant, with a planned total investment of ¥385 million funded through borrowings, scheduled completion in September 2017, and a slight expected increase in capacity after completion. - FY2017-Q2First statedAnnual report
「During the six-month cumulative consolidated period, the following newly confirmed major capital investment plan was established: Company: IWABUCHI CORPORATION, Matsudo No. 2 Plant; Location: Matsudo, Chiba; Equipment: production equipment; Planned investment: ¥385 million in total; Funding: borrowings; Start: October 2016; Completion: September 2017; Increase in capacity after completion: slight.」
A new plan was finalized to install production equipment at the Matsudo No. 2 Plant. The planned total investment is ¥385 million, funded through borrowings, with work scheduled to begin in October 2016 and be completed in September 2017. The resulting increase in capacity is expected to be slight.