Komori
Fujisash (5940) · TargetAdvanced

2050 Net Zero, 2030 Greenhouse Gas Reduction, and SBT Certification

First written in FY2023. 4 of 6 entries say "Advanced", first in FY2024. Latest entry: FY2026.

6entries
4years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023AdvancedFY2024 – 2026-05-142023: 120232024: 120242025: 120252026: 32026
Same theme, other companies
GHG emissions (Scopes 1–3): calculation, emissions-reduction target-setting and renewable energy procurementA theme 991 companies write about · 6 as a headwind · 1048 as a tailwind
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 191 companies compared. The sentences above are computed from all 191.Comparing 200 of the theme's 1055 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In fiscal 2025, the reduction pace for both Scope 1+2 and Scope 3 recovered to a steady level. Scope 1+2 emissions were reduced by 29% against a benchmark of 19%, putting progress 11% ahead, while Scope 3 emissions were reduced by 24% against a benchmark of 13%, putting progress 8% ahead.」

    Against the SBT certification targets, Scope 1+2 emissions were reduced by 29% and Scope 3 emissions by 24% in fiscal 2025, exceeding the respective benchmarks.
  2. FY2025AdvancedAnnual report

    「Although the reduction pace for Scope 1+2, particularly Scope 1, slowed in fiscal 2024, Scope 3 emissions continued to decline steadily. Scope 1+2 emissions were reduced by 11% against a benchmark of 14%, representing a 3% delay, while Scope 3 emissions were reduced by 20% against a benchmark of 10%, putting progress 10% ahead.」

    Progress following SBT certification was disclosed. In fiscal 2024, Scope 1+2 reductions were 3% behind the baseline, while Scope 3 reductions were 10% ahead. The group is also expanding the operation of solar power plants and advancing its decarbonisation roadmap.
  3. FY2024AdvancedAnnual report

    「In December 2023, we submitted an application for SBT certification, the review began in late April 2024, and certification was obtained on 13 June 2024.」

    Following the application and review process for SBT certification, certification was obtained on 13 June 2024. The group has also disclosed targets of a 42% reduction in Scope 1+2 emissions and a 30% reduction in Scope 3 emissions in fiscal 2030, and net zero in fiscal 2050.
  4. FY2023First statedAnnual report

    「With the aim of achieving net-zero greenhouse gas emissions by 2050, our group has established greenhouse gas reduction targets for 2030 and is preparing to obtain SBT certification.」

    The group has set net zero by 2050 as its long-term target and is preparing 2030 fiscal-year reduction targets and SBT certification. It identifies insulation and energy-saving products, recycled aluminium and solar power generation as specific measures, and has also disclosed Scope 1 and 2 emissions of 67,475t.
Moved together

"Building a resilient business system through company-wide PDCA" moved the same way as this thread, in the same document, in 4 of its 6 moves.

444333★123456
  1. ★This thread
  2. 1Building a resilient business system through company-wide PDCA4×
  3. 2Recovery in logistics volumes and strengthening of the warehousing business4×
  4. 3Investment in production facility upgrades and solar power generation-related equipment4×
  5. 4Securing Profitability and Price Competitiveness in the Building Sash Business3×
  6. 5Diversifying revenue sources through the renovation, fronts, environmental and aluminum processing fields3×
  7. 6Decline in Net Assets and Lower Equity Ratio3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Fujisash's next results are scheduled for 2026-11-05. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-06-03: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.