Results for this period
First quarter1 April 2026 to 30 June 2026Non-consolidated (standalone)Japanese GAAPThe width of the band at each stage is based on revenue. The narrower it becomes toward the bottom, the smaller the proportion of revenue that remains as profit. The dotted outline is the full-year forecast and the band inside it is the result for this period. The progress rate is the result divided by the forecast.
塗りつぶした部分が自己資本比率です。総資産のうち、返済のいらない自前の資金がどれだけかを表します。The thin vertical line indicates the level at the end of the previous fiscal year.
Stacked from zero: upward is an increase in cash, downward a decrease (in ¥ thousand).The net change represented by the dotted line is the total of three items, calculated from figures provided by the company.
Compression of self-initiated construction projects in the power industry; soaring labor, material and construction costs; project delays and plan revisions due to labor shortages; sluggish orders for special products; and higher manufacturing expenses, including depreciation, associated with the construction of the Toyama Kureha Plant.
Not applicable (no matters to report in the notes on the going concern assumption)
| Item | Details |
|---|---|
| Fiscal Period Classification | First quarter |
| Accounting standards | Japanese GAAP |
| Consolidated / non-consolidated | Non-consolidated (standalone) |
| Period Covered | 1 April 2026 to 30 June 2026 |
| Net Sales | 1,793 Millions of yen (YoY -10.7%) |
| Operating profit | 80 Millions of yen (YoY -26.4%) |
| Ordinary income | 74 Millions of yen (YoY -33.8%) |
| Profit attributable to owners of the parent | 55 Millions of yen (YoY -35.1%) |
| Net income per share | ¥70.74 |
| Equity ratio | End of the current fiscal period 56.9 / End of previous period 57.8 |
| Total assets | 7,837 Millions of yen |
| Net assets | 4,461 Millions of yen |
| Cash flows from operating activities | ¥314,502 thousand |
| Cash flows from investing activities | ¥-1,223 thousand |
| Cash flows from financing activities | ¥-45,785 thousand |
| Cash and cash equivalents at end of period | ¥1,490,091 thousand |
| Full-year earnings forecast | Net Sales 7,975 Millions of yen (YoY +6.0%) / Operating profit 385 Millions of yen (YoY -5.0%) / Ordinary income 370 Millions of yen (YoY -2.7%) / Net income 260 Millions of yen (YoY -12.5%) |
| Annual Dividend Forecast | ¥30 → ¥30(0.0%) |
| Segment revenue | Power and Telecommunications Division ¥1,194,216 thousand (YoY -3.8%), Building Materials Division ¥598,903 thousand (YoY -21.8%) |
| Segment profit | Power and Telecommunications Division ¥138,014 thousand (YoY -24.0%), Building Materials Division ¥26,244 thousand (YoY -37.8%) |
| Depreciation and amortization | ¥57,820 thousand |
| Breakdown of extraordinary income (loss) | Extraordinary income Not disclosed / Extraordinary loss Loss on disposal and sale of non-current assets ¥1,147 thousand |
| Disclosure regarding the going concern assumption | Not applicable (no matters to report in the notes on the going concern assumption) |
| Change in accounting policy | Changes due to revisions to standards No / Other changes No / Change in accounting estimate No / Restatement No |
| Availability of Supplementary Financial Results Materials | No |
| Availability of Financial Results Briefing | Whether applicable No / Subject person Not disclosed |
| Issued Shares at Period-End | 780,000 Shares |
| Treasury Shares at Period-End | 941 Shares |
| Factors Behind Changes in Business Performance | Compression of self-initiated construction projects in the power industry; soaring labor, material and construction costs; project delays and plan revisions due to labor shortages; sluggish orders for special products; and higher manufacturing expenses, including depreciation, associated with the construction of the Toyama Kureha Plant. |
Items this document does not state (9)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In the power industry, self-initiated construction projects were compressed due to soaring labor and material costs. In the construction industry, project delays and plan revisions occurred because of labor shortages and the reassessment of construction costs. In addition, orders for special products such as fencing work were sluggish, while manufacturing expenses, including depreciation, increased in connection with the construction of the Toyama Kureha Plant.