TAKADAKIKO(Steel Construction) (5923) · RiskMitigated
Aging and removal response for the retaining wall at the west yard of the Wakayama Plant
First written in FY2024. 1 of 2 entries say "Materialised", first in FY2024. Latest entry: FY2025.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Provision for Fixed-Asset Removal CostsA theme 17 companies write about · 16 as a headwind · 0 as a tailwind
The whole theme swung hardest in 2024: 2 of 10 companies on the "Worse" side.
3 other companies' latest entry also says "Mitigated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 17 companies compared. The sentences above are computed from all 17.Full recordFilings, disclosures and news, newest first
- FY2025MitigatedAnnual report
「Structures: West yard retaining wall renovation work ¥53.990 million」
For the retaining wall in the west yard of the Wakayama Plant, for which a ¥90.090 million provision for removal loss was recorded in the previous fiscal year due to deterioration, renovation work costing ¥53.990 million was carried out during the fiscal year, and the provision for removal loss was fully reversed. - FY2024MaterialisedAnnual report
「The retaining wall in the west yard of the Wakayama Plant has deteriorated severely over time, and leaving it unattended could result in a serious accident. Accordingly, ¥90.090 million in dismantling and removal costs for reinforcing the foundations has been recognized as a provision for special loss. Provision for removal loss ¥90.090 million」
Deterioration over time of the retaining wall in the west yard of the Wakayama Plant became a specific safety issue, and ¥90.090 million in dismantling and removal costs for reinforcing the foundations was recognized as a provision.