TAKADAKIKO(Steel Construction) (5923) · RiskWorsened

Concerns over construction progress due to insufficient capacity among fabricators

First written in FY2017. 3 of 6 entries say "Worsened", first in FY2022. Latest entry: FY2025-H1.

6entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017RestatedFY2023-Q2 – FY2023-Q32017: 120172018: 020182019: 020192020: 020202021: 020212022: 220222023: 120232024: 22024
Same theme, other companies
Construction project delays caused by labor shortages in the construction industryA theme 34 companies write about · 34 as a headwind · 0 as a tailwind

TAKADAKIKO(Steel Construction) moved to the "Worse" side of this theme in 2024, 4 years after the typical company in this theme (2020).

The whole theme swung hardest in 2022: 6 of 14 companies on the "Worse" side.

7 other companies' latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 34 companies compared. The sentences above are computed from all 34.
Full recordFilings, disclosures and news, newest first
  1. FY2025-H1WorsenedAnnual report

    「Although the steel structures business has potential demand from large-scale redevelopment projects in the Tokyo metropolitan area and integrated resort-related projects in the Kansai region, delays to construction schedules and design revisions caused by soaring construction costs and labour shortages became evident, and instances of lower order prices to secure work were observed.」

    Labor shortages have made construction delays and design reviews apparent, bringing longstanding concerns about the supply capacity of specialist contractors and skilled workers into concrete focus.
  2. FY2024WorsenedAnnual report

    「Although large-scale redevelopment projects in the Tokyo metropolitan area remained firm, steel demand was sluggish during the year due to project cancellations and downsizing caused by unprecedented construction-cost increases, difficulties arranging specialist contractors, and shortages of engineers and skilled workers.」

    Difficulties arranging specialist contractors and shortages of engineers and skilled workers gave further concrete form to the longstanding concerns over the smooth progress of large-scale projects and supply capacity.
  3. FY2023-Q3RestatedAnnual report

    「In the steel structures business, large-scale redevelopment projects, mainly in the Tokyo metropolitan area, were generally ordered smoothly. However, amid issues involving schedule slippage and soaring steel and ancillary-material prices, securing appropriate order prices reflecting the higher costs remained an important issue for fabricators.」

    Orders for large-scale redevelopment projects are generally progressing smoothly, but schedule slippage remains an issue, and uncertainty persists over progress and supply in the fabricators' order environment.
  4. FY2023-Q2RestatedAnnual report

    「In the steel structures business, large-scale redevelopment projects, mainly in the Tokyo metropolitan area, were generally ordered smoothly. However, combined with issues involving schedule slippage and the impact of soaring steel and ancillary-material prices, the order environment for fabricators continued to lack clarity.」

    Although orders for large-scale projects are progressing, schedule slippage remains an issue, and uncertainty persists over fabricator construction progress and supply capacity.
  5. FY2022WorsenedAnnual report

    「Numerous challenges, including the normalization of construction-period and schedule slippage, a shortage of skilled workers and higher fuel costs, stand in the way, making a cautious approach to securing orders necessary.」

    In connection with the longstanding concerns over fabricator supply capacity, shortages of skilled workers have emerged as an industry-wide challenge.
  6. FY2017First statedAnnual report

    「Given the shortage of engineers on the client side and the supply capacity of fabricators, uncertainty remains over whether progress can proceed smoothly.」

    Against the outlook for a sharp increase in demand for large-scale redevelopment projects, the company newly disclosed the possibility that fabricator supply capacity could constrain smooth construction progress.
Moved together

"Rising Steel Prices and Insufficient Procurement Volumes" moved the same way as this thread, in the same document, in 3 of its 6 moves.

33322★12345
  1. ★This thread
  2. 1Rising Steel Prices and Insufficient Procurement Volumes3×
  3. 2Intensifying Competition for Bridge Contracts and Narrow-Margin Bid Losses3×
  4. 3Delays to the steel-frame construction schedule due to a shortage of technical personnel on the client side3×
  5. 4Securing a Stable Order Pipeline2×
  6. 5Cancellations and Postponements of Structural Steel Projects Due to COVID-19 and Slowing Demand2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TAKADAKIKO(Steel Construction) yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Concerns over construction progress due to insufficient capacity among fabricators | TAKADAKIKO(Steel Construction)CO.,LTD. (5923) | Komori