Komori
Swcc (5805) · RiskRestated

Operational Shutdowns and BCP Risk from Natural Disasters and Accidents

First written in FY2019. 3 of 4 entries say "Restated". Latest entry: FY2025.

4entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019 – FY20252019: 120192020: 120202021: 020212022: 020222023: 020232024: 120242025: 12025
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 501 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「・ Formulation and review of a BCP (business continuity plan) to take a smooth initial response to anticipated risks ・ Planned investment to strengthen infrastructure facilities at manufacturing sites ・ Coverage under disaster insurance」

    The company continues to formulate and review its BCP, strengthen facilities and maintain insurance coverage in response to the risk of operational shutdowns and logistics disruptions caused by natural disasters and other events.
  2. FY2024RestatedAnnual report

    「To take a smooth initial response to anticipated risks, the company has formulated and reviewed its BCP (business continuity plan), and is making planned investments to strengthen infrastructure facilities at manufacturing sites.」

    The company continues to formulate and review its BCP and invest in strengthening manufacturing sites in response to operational shutdowns and logistics disruptions caused by natural disasters and other events.
  3. FY2020RestatedAnnual report

    「In addition to formulating a BCP covering the supply chain, the company is making planned investments to strengthen infrastructure facilities at manufacturing sites and is working to reduce risks.」

    The company continues its BCP covering the supply chain and investments to strengthen facilities in response to the risks of operational shutdowns and logistics disruptions caused by natural disasters and accidents.
  4. FY2019First statedAnnual report

    「The company has formulated a BCP (business continuity plan) covering the supply chain in order to take a smooth initial response to anticipated risks, in preparation for the shutdown of manufacturing sites and disruption of logistics functions resulting from major earthquakes, typhoons, floods and other natural disasters, including abnormal weather caused by climate change, as well as accidents such as fires.」

    The company has formulated a BCP covering natural disasters, abnormal weather caused by climate change and fires, including measures to address manufacturing and logistics stoppages.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Swcc yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.