Komori
Uacj (5741) · RiskMitigated

Operational Shutdowns Caused by Accidents Involving High-Temperature and High-Pressure Equipment

First written in FY2016. 2 of 6 entries say "Materialised", first in FY2019. Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017MaterialisedFY2019MitigatedFY2022MaterialisedFY20242016: 120162017: 120172018: 020182019: 120192020: 020202021: 020212022: 120222023: 020232024: 120242025: 020252026: 12026
Same theme, other companies
Operational Risks Including Fires, Explosions and Operating AccidentsA theme 3 companies write about · 3 as a headwind · 0 as a tailwind

0 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「・Consideration of establishing a safety training center (operations to begin in April 2026)」

    The Company states that it plans to begin operating a safety training center in April 2026 in response to risks including fires, explosions, and occupational accidents.
  2. FY2024MaterialisedAnnual report

    「Occupational health and safety Number of serious accidents Zero 1」

    For fiscal 2023, the Company reported 1 serious accident against a target of zero. The overall frequency rate was 0.17.
  3. FY2022MitigatedAnnual report

    「・Continued allocation of management resources and implementation of measures to eliminate workplace hazards, including fire and explosion risk assessments」

    In response to the risk of accidents involving high-temperature and high-pressure facilities, the Company identifies fire and explosion risk assessments, elimination of workplace hazards, and allocation of management resources as countermeasures.
  4. FY2019MaterialisedAnnual report

    「Losses from fire 374」

    A fire occurred at the Nagoya Manufacturing Plant, and the Company recorded a fire-related loss of ¥374 million during the consolidated fiscal year. Accidents involving high-temperature and high-pressure facilities and other equipment have materialized as actual losses.
  5. FY2017RestatedAnnual report

    「Major facilities such as casting furnaces and hardening furnaces operate at high temperatures and pressures. Although the Company takes every possible measure to prevent accidents arising from these conditions, a serious accident could disrupt the Group's production activities and affect its business performance.」

    The Company continues to disclose the risk of production shutdowns caused by accidents at high-temperature and high-pressure facilities.
  6. FY2016First statedAnnual report

    「Major facilities such as casting furnaces and hardening furnaces operate at high temperatures and pressures. Although the Company takes every possible measure to prevent accidents arising from these conditions, a serious accident could disrupt the Group's production activities and affect its business performance.」

    While taking measures to prevent facility accidents, the Company discloses the risk that a serious accident could affect operations.
Moved together

"Preservation of the Global Environment and Resource Recycling" moved the same way as this thread, in the same document, in 2 of its 6 moves.

222222★123456
  1. ★This thread
  2. 1Preservation of the Global Environment and Resource Recycling2×
  3. 2Stable and continuous dividends2×
  4. 3Price fluctuations in aluminum and copper ingots, crude oil, and other commodities2×
  5. 4Financial Targets in Medium-Term Management Plans (ROIC, ROE, Profit, etc.)2×
  6. 5Strengthening Advanced and Basic Research and Developing New Technologies and Products2×
  7. 6Concentration of Auxiliary Raw Material Procurement in China and Supply Constraints for High-Purity Ingots2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Uacj yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Operational Shutdowns Caused by Accidents Involving High-Temperature and High-Pressure Equipment | UACJ Corporation (5741) | Komori