Concentration of Production Facilities in Fukushima Prefecture and Natural Disaster Risk
First written in FY2016. 2 of 8 entries say "Restated". Latest entry: FY2023.
The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.
- FY2023MitigatedAnnual report
「To address this situation, the Group prepares to prevent disasters, minimise damage and promptly restore operations following a disaster through regular equipment inspections, repairs to aging buildings and other facilities, and disaster-preparedness drills. The Group has also obtained certification from the Minister of Economy, Trade and Industry under the Business Continuity Enhancement Plan Certification System.」
As measures addressing the concentration of production facilities in Koriyama, Fukushima Prefecture, and natural-disaster risk, the company states that it conducts equipment inspections, repairs and disaster-preparedness drills, and has obtained certification from the Minister of Economy, Trade and Industry under the Business Continuity Enhancement Plan Certification System. - FY2022MaterialisedAnnual report
「Restoration costs associated with damage from the earthquake off the coast of Fukushima Prefecture in March 2022 were recognised as an extraordinary loss.」
The company disclosed damage from the March 2022 earthquake off the coast of Fukushima Prefecture and the recognition of restoration costs in connection with the concentration of production facilities in Koriyama, Fukushima Prefecture, and natural-disaster risk. - FY2020-Q2MitigatedAnnual report
「Fukuyama Plant resumed operations in April and completed restoration in May.」
The company states that Fukuyama Plant resumed operations in April and completed restoration in May following flood damage caused by Typhoon Hagibis. - FY2020-Q1WorsenedAnnual report
「In October, flooding caused by Typhoon Hagibis damaged the head office plant and Fukuyama Plant, both in Koriyama, Fukushima Prefecture. Fukuyama Plant, which produces some products for the environmental business, suspended operations after its production equipment was submerged. As of the end of the first quarter of the current fiscal year, ¥228.118 million in restoration costs related to the typhoon damage had been recognised as an extraordinary loss.」
Flood damage to the plants caused by Typhoon Hagibis led to the suspension of operations at Fukuyama Plant and the recognition of ¥228.118 million in restoration costs, with the actual impact of natural-disaster risk continuing. - FY2019MaterialisedAnnual report
「The head office plant and Fukuyama Plant were damaged by flooding caused by Typhoon Hagibis in October 2019.」
The natural-disaster risk disclosed in connection with the concentration of plants in Koriyama, Fukushima Prefecture, materialised as flood damage at the head office plant and Fukuyama Plant caused by Typhoon Hagibis. - FY2018RestatedAnnual report
「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」
The Group reconfirms the risk to business continuity from production facilities concentrated in Koriyama, Fukushima Prefecture, and natural disasters and accidents. - FY2017RestatedAnnual report
「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」
The Group reconfirms the risk to business continuity from production facilities concentrated in Koriyama, Fukushima Prefecture, aging buildings, and natural disasters and accidents. - FY2016First statedAnnual report
「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」
The Group identifies the risk to business continuity from natural disasters and accidents, against a backdrop of production facilities concentrated in Koriyama, Fukushima Prefecture, and aging buildings.