Concentration of Production Facilities in Fukushima Prefecture and Natural Disaster Risk

First written in FY2016. 2 of 8 entries say "Restated". Latest entry: FY2023.

8entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018MitigatedFY2020-Q2MaterialisedFY20222016: 12017: 120172018: 120182019: 120192020: 220202021: 020212022: 120222023: 12023
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 501 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2023MitigatedAnnual report

    「To address this situation, the Group prepares to prevent disasters, minimise damage and promptly restore operations following a disaster through regular equipment inspections, repairs to aging buildings and other facilities, and disaster-preparedness drills. The Group has also obtained certification from the Minister of Economy, Trade and Industry under the Business Continuity Enhancement Plan Certification System.」

    As measures addressing the concentration of production facilities in Koriyama, Fukushima Prefecture, and natural-disaster risk, the company states that it conducts equipment inspections, repairs and disaster-preparedness drills, and has obtained certification from the Minister of Economy, Trade and Industry under the Business Continuity Enhancement Plan Certification System.
  2. FY2022MaterialisedAnnual report

    「Restoration costs associated with damage from the earthquake off the coast of Fukushima Prefecture in March 2022 were recognised as an extraordinary loss.」

    The company disclosed damage from the March 2022 earthquake off the coast of Fukushima Prefecture and the recognition of restoration costs in connection with the concentration of production facilities in Koriyama, Fukushima Prefecture, and natural-disaster risk.
  3. FY2020-Q2MitigatedAnnual report

    「Fukuyama Plant resumed operations in April and completed restoration in May.」

    The company states that Fukuyama Plant resumed operations in April and completed restoration in May following flood damage caused by Typhoon Hagibis.
  4. FY2020-Q1WorsenedAnnual report

    「In October, flooding caused by Typhoon Hagibis damaged the head office plant and Fukuyama Plant, both in Koriyama, Fukushima Prefecture. Fukuyama Plant, which produces some products for the environmental business, suspended operations after its production equipment was submerged. As of the end of the first quarter of the current fiscal year, ¥228.118 million in restoration costs related to the typhoon damage had been recognised as an extraordinary loss.」

    Flood damage to the plants caused by Typhoon Hagibis led to the suspension of operations at Fukuyama Plant and the recognition of ¥228.118 million in restoration costs, with the actual impact of natural-disaster risk continuing.
  5. FY2019MaterialisedAnnual report

    「The head office plant and Fukuyama Plant were damaged by flooding caused by Typhoon Hagibis in October 2019.」

    The natural-disaster risk disclosed in connection with the concentration of plants in Koriyama, Fukushima Prefecture, materialised as flood damage at the head office plant and Fukuyama Plant caused by Typhoon Hagibis.
  6. FY2018RestatedAnnual report

    「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」

    The Group reconfirms the risk to business continuity from production facilities concentrated in Koriyama, Fukushima Prefecture, and natural disasters and accidents.
  7. FY2017RestatedAnnual report

    「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」

    The Group reconfirms the risk to business continuity from production facilities concentrated in Koriyama, Fukushima Prefecture, aging buildings, and natural disasters and accidents.
  8. FY2016First statedAnnual report

    「Because the Group's production facilities are concentrated in Koriyama, Fukushima Prefecture, natural disasters such as earthquakes, typhoons and floods, as well as disasters caused by unforeseen accidents, could create conditions that make it difficult to continue operations.」

    The Group identifies the risk to business continuity from natural disasters and accidents, against a backdrop of production facilities concentrated in Koriyama, Fukushima Prefecture, and aging buildings.
Moved together

"Exposure to Exchange Rate Fluctuations" moved the same way as this thread, in the same document, in 3 of its 8 moves.

322222★123456
  1. ★This thread
  2. 1Exposure to Exchange Rate Fluctuations3×
  3. 2Commercialization of the Rare Metal and Rare Earth Recycling Business at the Iwaki Plant2×
  4. 3Exposure to demand trends in the electronic components and devices industry2×
  5. 4Accelerating the Creation of New Businesses and Expansion into New Markets, Including Overseas Markets2×
  6. 5Financial Covenants in Syndicated Loans2×
  7. 6Transition of a Malaysian subsidiary to a precious metals recovery business2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Asaka Riken yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.