Komori
Toho Zinc (5707) · InitiativeWorsenedLatest Financial results presentation (2026-08-14): "Advanced"

Expanding Lead and Silver Smelting Production and Establishing a Lead Recycling Loop

First written in FY2025. 2 of 5 entries say "Worsened", first in FY2026-H1. Latest entry: 2026-08-14.

5entries
2years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2025WorsenedFY2026-H12025: 220252026: 32026
Same theme, other companies
Advanced Processing of Recycled Feedstock and Metal Recovery in SmeltingA theme 7 companies write about · 2 as a headwind · 7 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-14AdvancedFinancial results presentation

    「Expand the waste-battery processing line and strengthen coverage in areas from which batteries could not previously be collected.」

    The company presented specific measures to expand waste-battery collection and processing capacity toward establishing a lead recycling loop.
  2. FY2026WorsenedAnnual report

    「Lead product production declined due to weak operations in the first half, among other factors, resulting in a 9.3% year-on-year decline in revenue.」

    While the company is targeting expanded lead and silver smelting production, lead product production and revenue declined due to weak operations in the first half, worsening performance against the production expansion theme.
  3. 2026-05-14AdvancedFinancial results presentation

    「Increasing the recycling ratio in lead smelting and establishing a resource-circulation system」

    The company continued to develop measures for its foundation businesses after the revitalization, aiming to increase the recycling ratio in lead smelting and establish a resource-circulation system.
  4. FY2026-H1WorsenedAnnual report

    「《Lead》Due to lower production, sales volume declined year on year, resulting in a 15% year-on-year decline in revenue.」

    While the company is targeting expanded lead and silver smelting production, revenue from lead products declined 15% year on year due to lower production, worsening performance against the production expansion theme.
  5. FY2025First statedAnnual report

    「In the lead and silver smelting business, we will work to further expand lead production and strengthen the production and sales of precious metals such as gold and silver, which are by-products, and rare metals such as bismuth. We will also strengthen cooperation with companies across the value chain, including users of lead batteries, lead battery manufacturers and collection operators, while focusing on increasing the lead recycling ratio and establishing a lead recycling loop.」

    As growth measures for the core businesses following the business revitalization, the company presented for the first time a systematic plan to expand lead and silver production, strengthen by-product recovery, increase the recycling ratio for lead batteries, and collaborate across the value chain.
Moved together

"Early restoration of financial soundness" moved the same way as this thread, in the same document, in 3 of its 5 moves.

322222★123456
  1. ★This thread
  2. 1Early restoration of financial soundness3×
  3. 2Impact of Metal Price Fluctuations on Financial Results2×
  4. 3Consolidated results turn profitable from losses in the same period of the previous year2×
  5. 4Operating Accidents and Incidents, and Safe, Stable Operations in the Smelting and Resources Business2×
  6. 5Securing Stable Earnings Through Businesses Less Affected by Market Conditions2×
  7. 6Market and Economic Fluctuations Caused by the Situation in Ukraine, Lockdowns in China and Other Factors2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toho Zinc yet. It last moved in the Financial results presentation of 2026-08-14: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Expanding Lead and Silver Smelting Production and Establishing a Lead Recycling Loop | Toho Zinc Co.,Ltd. (5707) | Komori