Komori
Toho Zinc (5707) · InitiativeDropped

Strengthening CBH’s management foundation and improving mining operation efficiency

First written in FY2016. 17 of 32 entries say "Worsened", first in FY2019-Q2. Latest entry: FY2026-H1.

32entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseWorsenedFY2019-Q2 – FY2021WorsenedFY2023-Q2 – FY20242016: 220162017: 420172018: 320182019: 420192020: 320202021: 320212022: 420222023: 420232024: 320242025: 22025
Same theme, other companies
CBH Resources mine operating efficiency and exit from the businessA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026-H1DroppedAnnual report

    「In the previous consolidated fiscal year, the two operating companies for the Endeavour Mine and the one operating company for the Rasp Mine, formerly consolidated subsidiaries, were excluded from the scope of consolidation following the transfer of all shares held in them as part of the withdrawal from the resources business.」

    The focus changed from the previous phase of strengthening CBH's mining management base and improving operating efficiency to withdrawing from the resources business through the transfer of all shares in the mine operating companies.
  2. FY2025ReframedAnnual report

    「The two operating companies for the Endeavour Mine and the one operating company for the Rasp Mine, formerly consolidated subsidiaries and all subsidiaries of CBH Resources Ltd., were excluded from the scope of consolidation for the current consolidated fiscal year because all shares held in them were transferred.」

    The focus changed from improving the efficiency of CBH's mine operations to withdrawing from the mining business through the transfer of the operating subsidiaries of the Endeavour and Rasp mines.
  3. FY2025-H1ReframedAnnual report

    「In July 2024, all shares held in Cobar Operations Pty Ltd. and Endeavor Operations Pty Ltd., the operating subsidiaries of the Endeavour Mine and wholly owned subsidiaries of CBH Resources Ltd. in Australia, were transferred.」

    The focus changed from the previous phase of improving the efficiency of CBH's mine operations and strengthening its management base to withdrawing from the resources business through the transfer of shares in the Endeavour Mine's operating subsidiaries.
  4. FY2024WorsenedAnnual report

    「Abra, an equity-method affiliate in which the company holds a 40% interest through CBH, operates the Abra Mine. The mine began full-scale operations in January 2023, but production fell substantially below the initial plan due to the impact of heavy rain in March 2023, unstable operations caused by start-up factors and a shortage of skilled operators.」

    Even after Abra began full-scale operations, heavy rain, unstable operations and a shortage of skilled operators caused performance to fall short of plan, worsening CBH's operating and earnings conditions.
  5. FY2024-Q3WorsenedAnnual report

    「At Australia's CBH Co., profit declined at the Rasp mine due to lower concentrate shipments resulting from reduced ore throughput and lower ore grades. The Abra mine, which began full-scale operations in January 2023, also recorded a ¥2.6 billion equity-method investment loss due to unstable operations during the initial start-up phase and interest costs associated with development.」

    At CBH, declining operating efficiency at the Rasp Mine, unstable start-up operations at the Abra Mine and development-related interest costs resulted in an equity-method investment loss of ¥2.6 billion.
  6. FY2024-Q2WorsenedAnnual report

    「At CBH in Australia, lower throughput and ore grades at the Rasp Mine reduced concentrate shipments and profit. At the Abra Mine, which began full-scale operations in January 2023, initial start-up factors resulted in losses preceding earnings, while development-related interest costs led to an equity-method investment loss of just under ¥2 billion.」

    At CBH, lower throughput and ore grades at the Rasp Mine, initial operating losses at the Abra Mine and development-related interest costs weakened operating efficiency and profitability.
  7. FY2024-Q1WorsenedAnnual report

    「At CBH in Australia, actual mining of the high-grade orebody at the Rasp Mine was postponed until the beginning of fiscal 2024, resulting in lower run-of-mine ore grades and production cuts. At the Abra Mine, which began full-scale operations during the current quarter, initial start-up factors resulted in losses preceding earnings, while development-related interest costs also led to an equity-method investment loss of just over ¥900 million.」

    At CBH, lower grades and production cuts at the Rasp Mine, initial start-up losses at the Abra Mine and development-related interest costs resulted in an equity-method investment loss.
  8. FY2023WorsenedAnnual report

    「Although higher metal prices and a weaker Australian dollar provided support, concentrate production at CBH's Rasp Mine in Australia declined from the previous period, mainly because ore grades fell as the amount of high-grade ore mined decreased, compounded by reduced operation of the processing plant due to a shortage of operators amid the COVID-19 pandemic.」

    Although higher metal prices and a weaker Australian dollar provided support, mining and ore-processing problems at the Rasp Mine weakened CBH's profitability and operating efficiency.
  9. FY2023-Q3WorsenedAnnual report

    「Although higher metal prices and a weaker Australian dollar had a favorable impact, revenue declined year on year partly because of lower ore shipments. In addition, production cuts resulting from lower run-of-mine ore grades, together with the resulting deterioration in productivity, caused operating profit to turn into a loss.」

    Lower ore shipments, lower run-of-mine ore grades, production cuts and deteriorating productivity in the resources business, including CBH, resulted in an operating loss of ¥144 million.
  10. FY2023-Q2WorsenedAnnual report

    「Although ore sales declined, revenue increased slightly year on year due to higher metal prices and a weaker Australian dollar. Operating profit, however, declined due to lower production resulting from deteriorating ore grades and worsening ore sales terms.」

    In the resources business, including CBH, lower run-of-mine ore grades caused production cuts, while worsened terms for ore sales led to a 57% year-on-year decline in operating profit, weakening operating efficiency and profitability.
  11. FY2023-Q1RestatedAnnual report

    「Profit increased due to lower production costs resulting from improved ore grades, higher metal prices and a weaker Australian dollar.」

    In the resources business, including CBH, lower manufacturing costs resulting from improved run-of-mine ore grades were identified as a factor behind higher profit, and the improvement in operations and earnings has continued.
  12. FY2022AdvancedAnnual report

    「Rasp Mine productivity improvements contributed to earnings, with operating profit reaching ¥1,535 million, an increase of ¥2,971 million from the previous period, and the company returning to profitability.」

    Productivity improvements at the Rasp Mine contributed to the full-year return to profitability, making CBH's operational and earnings improvement concrete.
  13. FY2022-Q3RestatedAnnual report

    「Because the Australian Rasp mine changed to reduced production from the third quarter of 2020, crude ore production declined year on year, but improved ore grades reduced unit production costs for concentrate.」

    While continuing reduced production at the Rasp Mine, CBH has maintained profitability in the resources business through higher ore grades and improved unit manufacturing costs.
  14. FY2022-Q2MitigatedAnnual report

    「Revenue and operating profit increased, with the company returning to profitability, due to improved unit manufacturing costs resulting from higher ore grades and rising metal prices.」

    Higher ore grades and improved unit manufacturing costs at the Rasp Mine returned the resources business to profitability.
  15. FY2021WorsenedAnnual report

    「At CBH's Rasp Mine, operations shifted in July 2020 to an optimal production configuration involving an approximately 30% production cut aimed at improving economic performance. As a result, concentrate production declined, and, together with lower metal prices compared with the previous period, comparing January–December, and the suspension of operations at the Endeavour Mine, revenue fell to ¥7,557 million, a decrease of ¥3,888 million, or 34%, from the previous period.」

    The approximately 30% production cut at the Rasp Mine and the suspension of operations at the Endeavour Mine reduced CBH's operating scale and revenue. Meanwhile, the operating loss at the Endeavour Mine was eliminated.
  16. FY2021-Q3WorsenedAnnual report

    「Revenue declined year on year due in part to lower metal prices, comparing January–September with the same period of the previous year, and the suspension of operations at CBH's Endeavour Mine.」

    The Endeavour Mine remained suspended, while production cuts and lower ore grades occurred at the Rasp Mine, causing CBH's operating and earnings conditions to deteriorate. Revenue in the resources business fell 36% year on year.
  17. FY2021-Q2WorsenedAnnual report

    「Revenue declined substantially year on year due in part to lower metal prices, comparing January–June with the same period of the previous year, and the suspension of operations at CBH's Endeavour Mine.」

    The Endeavour Mine has been suspended since the end of last year, while the Rasp Mine also reported lower profit due to the impact of metal prices, and CBH's operating and earnings conditions continue to deteriorate.
  18. FY2020WorsenedAnnual report

    「Deep exploration aimed at extending the mine life produced insufficient results from an economic evaluation standpoint, and the mine was placed on care and maintenance at the end of 2019.」

    Deep exploration at the Endeavour Mine produced insufficient results, and the mine was placed on care and maintenance at the end of 2019. Operating conditions also deteriorated and ore grades declined at the Rasp Mine, weakening CBH's operating efficiency and profitability.
  19. FY2020-Q3WorsenedAnnual report

    「Amid a sharp fall in metal prices, comparing January–September with the previous period, shipments declined as a result of planned production cuts at the Endeavour Mine.」

    Planned production cuts and lower shipments at the Endeavour Mine have weakened CBH's operating volume and profitability.
  20. FY2020-Q2WorsenedAnnual report

    「Revenue declined substantially year on year due in part to the sharp fall in metal prices, comparing January–June with the previous period, and production cuts at the Endeavour Mine. The deterioration in metal prices also had a significant impact on earnings, resulting in a ¥2.9 billion year-on-year decline in profit.」

    Production cuts at CBH's Endeavour Mine have weakened revenue and profitability in the resources business.
  21. FY2020-Q1WorsenedAnnual report

    「Revenue declined substantially year on year due in part to the sharp fall in metal prices, comparing January–March with the previous period, and production cuts at the Endeavour Mine.」

    Production cuts at the Endeavour Mine have weakened CBH's operating volume and profitability.
  22. FY2019WorsenedAnnual report

    「Ore throughput at the Endeavour Mine increased from the previous period, when the effects of planned production cuts remained. However, worsening mining conditions beyond expectations, including rock strength, made it necessary to reduce the amount mined and resulted in lower ore grades.」

    Although ore throughput increased, worsening mining conditions and lower ore grades weakened operating efficiency and profitability at the Endeavour Mine.
  23. FY2019-Q3WorsenedAnnual report

    「Ore throughput at the Endeavour Mine increased year on year, partly because planned production cuts affected the beginning of the previous fiscal year. However, mining of lower-grade ore became unavoidable due to technical problems in mining, and concentrate production grew only modestly relative to the increase in ore throughput.」

    Mining technology problems and the mining of lower-grade ore at the Endeavour Mine weakened CBH's operating efficiency and profitability.
  24. FY2019-Q2WorsenedAnnual report

    「The business segment that includes CBH recorded lower revenue and profit year on year, partly due to lower sales and higher mining costs resulting from deteriorating productivity.」

    Deteriorating productivity and higher mining costs arose in the resources business, including CBH, causing operating profit in the previous year to turn into an operating loss.
  25. FY2019-Q1RestatedAnnual report

    「The business segment that includes CBH increased production year on year, partly because production was being reduced according to plan in the same period of the previous year. Metal prices were also higher year on year. As a result, revenue increased year on year, as did operating profit.」

    CBH's Endeavour Mine has continued to increase production from the planned cuts implemented in the same period of the previous year, contributing to higher revenue and profit in the resources business.
  26. FY2018-Q3AdvancedAnnual report

    「The business segment that includes CBH recorded a substantial year-on-year increase in revenue and profit, driven by higher metal prices and the significant impact of increased production following the lifting of production cuts at CBH’s Endeavor mine.」

    The increase in production at the Endeavour Mine after the production cuts were lifted made a significant contribution to results, and CBH's operational recovery and earnings improvement are progressing.
  27. FY2018-Q2AdvancedAnnual report

    「The business segment that includes CBH recorded higher revenue and profit year on year, despite such factors as preparatory costs recognized in connection with the lifting of production cuts at the Endeavor mine and the resulting preparation for increased production. The impact of higher metal prices was substantial.」

    The Endeavour Mine has moved into the phase of lifting its production cuts, and costs and investment for preparations toward full-scale operations are being recorded and advanced.
  28. FY2018-Q1AdvancedAnnual report

    「CBH's performance was strong, with operating profit rising by just under ¥600 million year on year to just under ¥700 million. However, the adjustment for the difference in fiscal year-end periods, as CBH closes its books in December, had a substantial negative impact, resulting in lower profit year on year.」

    On a standalone basis, CBH's operating profit rose by just under ¥600 million year on year to just under ¥700 million, indicating a specific improvement in earnings. However, the fiscal year-end adjustment had a negative impact on profit in the consolidated resources business.
  29. FY2017AdvancedAnnual report

    「At the Endeavour Mine, which had been operating under temporary production cuts, staffing increases and underground development are proceeding as planned toward full-scale operations.」

    Specific progress was reported at the Endeavour Mine, with staffing increases and underground development toward full-scale operations proceeding as planned.
  30. FY2017-Q3RestatedAnnual report

    「The division that includes CBH Co. reported a substantial decline in revenue, partly because shipments fell following planned production cuts at the Endeavor mine reflecting weak metal prices at the beginning of the period. Operating profit, however, turned positive due partly to lower depreciation expenses following the mine impairment recognized in the previous fiscal year, improved productivity at the Rasp mine and improved sales terms.」

    While the planned production cuts at the Endeavour Mine continue, improved earnings from a lighter burden after impairment charges, higher productivity and improved sales terms have also continued to be cited.
  31. FY2017-Q2AdvancedAnnual report

    「Operating profit turned positive, partly due to the reduced depreciation burden following the impairment of the mine carried out in the previous fiscal year, improved productivity at the Rasp mine, and improved sales conditions.」

    The company describes concrete improvements in Rasp mine productivity and sales terms, indicating progress in improving CBH Co.'s profitability.
  32. FY2016First statedAnnual report

    「At CBH Co., an executive officer of our company became CEO last July to strengthen the company's management platform. In addition, at its Endeavor mine, CBH Co. reduced crude ore production from February this year to 10,000 tonnes per month, one-quarter of normal production, and responded to the difficult situation by reducing its workforce by 116 people to a workforce of 60. Going forward, we will promote further efficiency improvements and earnings improvement at the company.」

    The company describes strengthening CBH Co.'s management platform and improving its earnings through the CEO appointment, production cuts and workforce reductions.
Moved together

"Achievement of the resource business's production plan and cost reductions" moved the same way as this thread, in the same document, in 22 of its 32 moves.

222017161514★123456
  1. ★This thread
  2. 1Achievement of the resource business's production plan and cost reductions22×
  3. 2Securing Stable Earnings Through Businesses Less Affected by Market Conditions20×
  4. 3Decline in the profitability and asset value of CBH's mines17×
  5. 4Demand and Sales Fluctuations by Application in the Electronic Materials Business16×
  6. 5Impact of Metal Price Fluctuations on Financial Results15×
  7. 6Efficient Operations in the Smelting Business14×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toho Zinc yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Strengthening CBH’s management foundation and improving mining operation efficiency | Toho Zinc Co.,Ltd. (5707) | Komori