Announced details
Transmission-line inspection, maintenance of power infrastructure, and sites in mountainous areas and narrow or confined locations
Approximately 73% weight reduction compared with the previous model (from 750g to under 200g), expansion of the applicable range from approximately 10–20% to approximately 40%, reduction in inspection time per span from 3 hours to 1.5 hours, and optimization of operating personnel from 3 to 2 people, with a future target of 1 person
Adopted by multiple power companies, with more than 20 implementation projects. The solution has been used continuously for more than 4 years since the start of actual operations.
A relationship originating from the joint development of BEP Line.
Tokyo Electric Power Company Holdings,Incorporated and 株式会社テプコシステムズ. Other information on their locations, representatives, capital, years of establishment and business activities is Not disclosed.
A module-rental subscription model. The specific price is Not disclosed.
The company intends to build a recurring revenue base, but the specific impact on financial results is Not disclosed.
The company does not address Contract Value.
| Item | Details |
|---|---|
| Names of Products / Services Covered | Transmission-line drone inspection solution “BEP Line”, “BEP Line mini” |
| Counterparty | Tokyo Electric Power Company Holdings,Incorporated, 株式会社テプコシステムズ |
| Counterparty overview | Tokyo Electric Power Company Holdings,Incorporated and 株式会社テプコシステムズ. Other information on their locations, representatives, capital, years of establishment and business activities is Not disclosed. |
| Relationship with the Company | A relationship originating from the joint development of BEP Line. |
| Offering price | A module-rental subscription model. The specific price is Not disclosed. |
| Launch date | The actual unit is scheduled to be unveiled publicly for the first time at “Japan Drone 2026,” which will be held from 3 June 2026. The launch date for BEP Line mini is Not disclosed. |
| Applicable area | Transmission-line inspection, maintenance of power infrastructure, and sites in mountainous areas and narrow or confined locations |
| Quantitative Effects | Approximately 73% weight reduction compared with the previous model (from 750g to under 200g), expansion of the applicable range from approximately 10–20% to approximately 40%, reduction in inspection time per span from 3 hours to 1.5 hours, and optimization of operating personnel from 3 to 2 people, with a future target of 1 person |
| Usage history | Adopted by multiple power companies, with more than 20 implementation projects. The solution has been used continuously for more than 4 years since the start of actual operations. |
| Impact on Business Performance | The company intends to build a recurring revenue base, but the specific impact on financial results is Not disclosed. |
Items this document does not state (8)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To meet customer requests to operate the solution with a small drone that is easy to carry into mountainous areas. After analyzing 49 inquiries received since June 2023, the company determined that improving mobility was the highest priority.