Komori
Pacific Metals (5541) · InitiativeAdvanced

Research and Development of Polymetallic Nodule Smelting Technology

First written in FY2024. 8 of 9 entries say "Advanced", first in FY2025-H1. Latest entry: 2026-09-17.

9entries
3years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024AdvancedFY2025-H1 – 2026-09-172024: 220242025: 220252026: 52026
Same theme, other companies
Development of commercial-scale smelting technology for polymetallic nodulesA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「We had been conducting smelting tests on polymetallic nodules located in the Clarion-Clipperton Zone in the Pacific, and became the first in the world to successfully conduct a commercial-scale continuous smelting test using full-scale equipment, specifically a rotary kiln and electric arc furnace, before carrying out a feasibility assessment.」

    For polymetallic nodules, the company conducted a feasibility assessment after successfully completing a commercial-scale continuous smelting test using full-scale equipment.
  2. FY2026-H1AdvancedAnnual report

    「For the business of producing battery-grade metal materials and steelmaking raw materials from seabed resources, we are reviewing contract smelting costs and the investment schedule based on the results of the feasibility study. We are also exchanging views with relevant parties in Japan and overseas in order to expand the business broadly.」

    For the seabed resources business, including polymetallic nodules, the company has progressed beyond the full-scale equipment testing stage to reviewing contract smelting costs and the investment schedule based on the feasibility study results and consulting with relevant parties.
  3. FY2025AdvancedAnnual report

    「We became the first in the world to successfully conduct a commercial-scale continuous smelting test using full-scale equipment, specifically a rotary kiln and electric arc furnace, and produced 35 t of high-quality nickel, copper, and cobalt alloy and 320 t of manganese silicate.」

    For polymetallic nodules, the company became the first in the world to successfully conduct a commercial-scale continuous smelting test using full-scale equipment and produced 35 tonnes of alloy and 320 tonnes of manganese silicate.
  4. FY2025-H1AdvancedAnnual report

    「We are conducting a feasibility study, jointly with an overseas company, for a business producing battery-grade metal materials and steelmaking raw materials from seabed resources,」

    The business of producing battery-grade metal materials and steelmaking raw materials from seabed resources has progressed from the research and development stage using existing facilities to a joint feasibility study with an overseas company.
  5. FY2024First statedAnnual report

    「We entered into a non-binding memorandum of understanding with The Metals Company, which holds exploration and commercial rights to polymetallic nodules located in the Clarion-Clipperton Zone in the Pacific, and began research and development of polymetallic nodule smelting technology using our existing facilities.」

    The company entered into a non-binding memorandum of understanding with a company holding exploration and commercial rights to polymetallic nodules and began research and development of smelting technology using its existing facilities.
Moved together

"Enhancing Profitability and Low-Cost Operations" moved the same way as this thread, in the same document, in 6 of its 9 moves.

654432★123456
  1. ★This thread
  2. 1Enhancing Profitability and Low-Cost Operations6×
  3. 2Comprehensive business partnership to commercialize the beryllium manufacturing and sales business5×
  4. 3Increase in cost due to declining inventory profitability4×
  5. 4Reducing Earnings Volatility Through Domestic Business Diversification4×
  6. 5Entry into the Electricity Retail Business and Start of Electricity Supply3×
  7. 6Business Model Transformation and Business Portfolio Restructuring Under the Medium- to Long-Term Strategy “PAMCOvision2031”2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Pacific Metals yet. It last moved in the Other Disclosures of 2026-09-17: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Research and Development of Polymetallic Nodule Smelting Technology | PACIFIC METALS CO.,LTD. (5541) | Komori