Komori
Pacific Metals (5541) · RiskRestatedLatest Occurring Fact (2026-06-25): "Other"

Operational Shutdown Risk Due to Serious Occupational Accidents, Equipment Accidents and Natural Disasters

First written in FY2016. 5 of 9 entries say "Restated". Latest entry: 2026-06-25.

9entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2020RestatedFY2023-Q1 – 2026-06-252016: 120162017: 120172018: 020182019: 020192020: 120202021: 020212022: 220222023: 120232024: 120242025: 020252026: 22026
Same theme, other companies
Risk of operational impacts from aging and failures of production equipment and occupational accidentsA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 2 of 7 companies on the "Worse" side.

1 other company's latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2024RestatedAnnual report

    「If a serious occupational accident, equipment accident or natural disaster occurs, operating results may be materially affected by the suspension or restriction of production activities.」

    While establishing a response structure involving the Risk Management Committee and other bodies, the company continues to disclose the risk of production stoppages caused by accidents and disasters.
  2. FY2023RestatedAnnual report

    「The Group has established a Risk Management Committee to correctly identify all risks that may arise, establish measures in advance to reduce the likelihood of their occurrence and mitigate losses if they occur, thoroughly manage crises when they arise, minimize damage, and take responsible action toward an early recovery. However, major occupational accidents, equipment accidents, or natural disasters could have a material impact on business performance by causing production activities to cease or become restricted.」

    The Risk Management Committee's advance response to accidents and disasters, as well as the risk of production stoppages, is being reconfirmed.
  3. FY2023-Q1RestatedAnnual report

    「The sales plan was set conservatively due to the impact of reduced production volumes following an accident in which molten material leaked from one of the three electric furnaces at the ferronickel production facility shortly before the end of the previous consolidated fiscal year」

    The impact of the accident involving molten material leaking from an electric furnace shortly before the end of the previous fiscal year continued into the current quarter, resulting in reduced production volumes and a more conservative sales plan.
  4. FY2022MaterialisedAnnual report

    「While one of the three electric furnaces at the ferronickel production facility was undergoing repairs, molten material remaining inside the furnace leaked outside, leaving one electric furnace shut down」

    The equipment accident previously described as a risk actually occurred as molten material leaked from an electric furnace, resulting in one furnace being shut down.
  5. FY2020RestatedAnnual report

    「If a serious occupational accident, equipment accident or natural disaster occurs, operating results may be materially affected by the suspension or restriction of production activities.」

    The response framework comprising the Crisis Response Meeting, regular equipment inspections and the Crisis Response Headquarters, as well as the risk of production shutdowns, has been reconfirmed.
  6. FY2017RestatedAnnual report

    「The Group has established crisis management regulations aimed at preventing crises that could seriously affect the Company, its affiliates or its employees. Under these regulations, it has organized a “Crisis Response Meeting” and conducts preventive activities relating to disasters and accidents, as well as regular equipment inspections. It also plans to establish a “Crisis Response Headquarters” to implement emergency measures when necessary. However, if a serious occupational accident, equipment accident or natural disaster occurs, operating results may be materially affected by the suspension or restriction of production activities.」

    The response framework comprising crisis management regulations, the Crisis Response Meeting, equipment inspections and the Crisis Response Headquarters, as well as the risk of production shutdowns in the event of accidents or disasters, is reiterated.
  7. FY2016First statedAnnual report

    「If a serious occupational accident, equipment accident or natural disaster occurs, operating results may be materially affected by the suspension or restriction of production activities.」

    The possibility of production stoppages or restrictions due to serious accidents or natural disasters is stated, along with arrangements including a crisis response meeting, a crisis response headquarters and equipment inspections.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Pacific Metals yet. It last moved in the Occurring Fact of 2026-06-25: "Other".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Operational Shutdown Risk Due to Serious Occupational Accidents, Equipment Accidents and Natural Disasters | PACIFIC METALS CO.,LTD. (5541) | Komori